Border Crossings: Albania - Kosovo: Difference between revisions

From EGTRE
Jump to navigationJump to search
No edit summary
(Drin valley route preferred)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
No rail routes.
No rail routes.
There has been an aspiration for many years to construct a railway linking Kosovo with the Albanian port of Durrës. With plans being developed in the early 2020s to relocate the port of Durrës to Porto Romano, the idea of a rail connected "Dry Port" in Prishtinë also emerged. Feasibility studies in 2023 led the two governments to announce in January 2024 that they had selected a preferred route for the new line, from Shkodër (Albania) via the Drin valley to Gjakova (Kosovo) to meet up with the nearby Klinë to Prizren line. More detailed studies are now planned.


== See also ==
== See also ==

Latest revision as of 12:48, 18 March 2024

No rail routes.

There has been an aspiration for many years to construct a railway linking Kosovo with the Albanian port of Durrës. With plans being developed in the early 2020s to relocate the port of Durrës to Porto Romano, the idea of a rail connected "Dry Port" in Prishtinë also emerged. Feasibility studies in 2023 led the two governments to announce in January 2024 that they had selected a preferred route for the new line, from Shkodër (Albania) via the Drin valley to Gjakova (Kosovo) to meet up with the nearby Klinë to Prizren line. More detailed studies are now planned.

See also