United Kingdom - General Information: Difference between revisions

From EGTRE
Jump to navigationJump to search
(→‎Temporary Closures:: Chinley (New Mills South Junction) to New Mills Central added. Guiseley spelling corrected.)
 
(841 intermediate revisions by 8 users not shown)
Line 2: Line 2:
United Kingdom of Great Britain and Northern Ireland
United Kingdom of Great Britain and Northern Ireland


Nomenclature: "Great Britain" comprises the Kingdoms of England and Scotland and the Principality of Wales. "United Kingdom" (in full: The United Kingdom of Great Britain and Northern Ireland) comprises Great Britain and the Province of Northern Ireland. "British Isles" is a purely geographical description for the British mainland and the island of Ireland; the latter contains the Province of Northern Ireland and the Republic of Ireland. The Isle of Man and the Channel Islands are usually regarded as part of the British Isles, although independent of the UK government. All but the Republic of Ireland (which is entirely independent of the UK) are under the British Crown (monarchy).
Nomenclature: "Great Britain" comprises the countries of England, Wales, and Scotland. "United Kingdom" (in full: The United Kingdom of Great Britain and Northern Ireland) comprises Great Britain and the Province of Northern Ireland. "British Isles" is a purely geographical description for the British mainland and the island of Ireland; the latter contains the Province of Northern Ireland and the Republic of Ireland. The Isle of Man and the Channel Islands are usually regarded as part of the British Isles, although independent of the UK government. All but the Republic of Ireland (which is entirely independent of the UK) are under the British Crown (monarchy).


==National Railway System==
==National Railway System==
Most infrastructure in Great Britain is owned by [http://www.networkrail.co.uk/ Network Rail], a company controlled by the government's [https://www.gov.uk/government/organisations/department-for-transport Department for Transport] (DfT).  Most passenger train services are provided by operators under franchise agreements with DfT, [https://tfl.gov.uk/ Transport for London], [http://www.merseytravel.gov.uk Merseytravel], [http://www.transportscotland.gov.uk/ Transport Scotland] or the [http://gov.wales/topics/transport/?lang=en Welsh Government]. Most franchisees are subsidiaries of major bus companies or national railways from other countries, principally Deutsche Bahn and Nederlandse Spoorwegen.  Full details are given by links from the [http://www.atoc.org/train-companies/ ATOC website]. Maps showing where the operators ply are at [http://www.barrydoe.co.uk/ Barry Doe's] and [http://www.projectmapping.co.uk Project Mapping] websites.  Passenger train operations collectively are known as 'National Rail'.
Most infrastructure in Great Britain is owned by [http://www.networkrail.co.uk/ Network Rail], a company controlled by the government's [https://www.gov.uk/government/organisations/department-for-transport Department for Transport] (DfT).  Most passenger train services are provided by operators under contracts with DfT, [https://tfl.gov.uk/ Transport for London], [http://www.merseytravel.gov.uk Merseytravel], [http://www.transportscotland.gov.uk/ Transport Scotland] or the [http://gov.wales/topics/transport/?lang=en Welsh Government]. Some operators are subsidiaries of major bus companies or national railways from other countries, for example Trenitalia. A UK Government subsidiary, [https://www.gov.uk/government/organisations/dft-olr-holdings-limited/about DfT OLR Holdings Limited], operates services if the contractor is no longer able to do so, has had the contract terminated because of default or there has been no acceptable tender for provision of the service.  [https://www.railholdings.scot/ Scottish Rail Holdings Limited] is the equivalent in Scotland.  Full details of passenger train operators are given by links from the [http://www.raildeliverygroup.com/about-us/uk-rail-industry/passenger-freight-track.html Rail Delivery Group] website. Maps showing where the operators ply are at [http://www.barrydoe.co.uk/ Barry Doe's] and [http://www.projectmapping.co.uk Project Mapping] websites.  Passenger train operations collectively are known as 'National Rail'
 
A new organisation, [https://gbrtt.co.uk/ Great British Railways] is being established to take strategic control of railways, in England at least, as well as taking over most of Network Rail's functions as infrastructure owner and operator throughout Britain. 
 
Railways in Northern Ireland are owned by Northern Ireland Transport Holding Company (which remains state-owned) and are operated as the [http://www.translink.co.uk/Services/NI-Railways/ N I Railways] (NIR) division of Translink.
 
Most operators in Great Britain had a franchise agreement, under which they took most of the commercial risk. DfT was considering changes to franchising when the Covid-19 pandemic made the system uneconomic, due to greatly reduced fares income to the operators.  Franchises were replaced by Emergency Recovery Management Agreements and subsequently by National Rail Contracts under which the Government meets operating costs and receives fares and other income.  The operating company is paid a management fee.  Transport for Wales, ScotRail, Caledonian Sleeper, LNER, Northern and Southeastern are all being operated by public sector companies.  


The operator of each train is indicated in the electronic National Rail Timetable and  
The operator of each train is indicated in the electronic National Rail Timetable and  
its printed derivatives by means of two-letter codes; for a de-coder and a chronology of  
its printed derivatives by means of two-letter codes; for a de-coder and a chronology of  
privatisation and transfer/re-branding of Great Britain's passenger railway franchises to  
privatisation and transfer/re-branding of Great Britain's passenger railway franchises to  
date go to the [http://www.railchronology.free-online.co.uk/ Rail Chronology website]. Basic customer information about and links to the websites of each TOC are available through the [http://www.nationalrail.co.uk/tocs_maps/tocs/TrainOperators.aspx National Rail website]. Some  
date go to the [http://www.railchronology.free-online.co.uk/ Rail Chronology] website. Basic customer information about and links to the websites of each TOC are available through the [http://www.nationalrail.co.uk/tocs_maps/tocs/TrainOperators.aspx National Rail] website. Some further information about passenger train operators and past franchisees can be found in the [https://www.gov.uk/government/publications/rail-franchise-schedule DfT] and [https://en.wikipedia.org/wiki/List_of_companies_operating_trains_in_the_United_Kingdom Wikipedia] websites. The Wikipedia list is usually more up to date and accurate than the DfT schedule!
further information about franchise periods and past franchisees can be found in [http://en.wikipedia.org/wiki/List_of_companies_operating_trains_in_the_United_Kingdom Wikipedia].
   
   
A small number of operators provide passenger services on the national network which are not franchised by the DfT. These include [http://www.eurostar.com/ ''Eurostar''] which is a unitary undertaking (Eurostar  
A small number of operators provide passenger services on the national network which are not under contract to the DfT. These include [http://www.eurostar.com/ ''Eurostar''] which is a unitary undertaking (Eurostar  
International Ltd) managed by SNCF, which has a 55% interest in the company.  Private investors acquired the UK government's 40% stake in 2015 and SNCB/NMBS owns the remaining 5%. In addition
International Ltd) managed by SNCF, which has a 55% interest in the company.  Private investors acquired the UK government's 40% stake in 2015 and SNCB/NMBS owns the remaining 5%. 'Open Access' passenger operators are:
 
* [https://www.hulltrains.co.uk/ Hull Trains] between London and Hull
* [https://www.grandcentralrail.com/ Grand Central] between London, Bradford and Sunderland
* [https://www.lumo.co.uk/ Lumo] between London and Edinburgh 
 
[http://www.granduniontrains.co.uk/ Grand Union Trains] intends to start services between London Paddington and Carmarthen and between London Euston and Stirling in 2025.   
 
In addition
* [http://www.eurotunnel.com/ Eurotunnel] operates a shuttle service for motor vehicles through the Channel Tunnel; this does not carry foot-passengers (although cyclists can be carried by arrangement)
* [http://www.eurotunnel.com/ Eurotunnel] operates a shuttle service for motor vehicles through the Channel Tunnel; this does not carry foot-passengers (although cyclists can be carried by arrangement)
* [http://www.nymr.co.uk/ North Yorkshire Moors Railway] operates timetabled steam trains through between Pickering/Goathland, Grosmont and Whitby during the summer.
* [http://www.nymr.co.uk/ North Yorkshire Moors Railway] operates timetabled steam trains through between Pickering/Goathland, Grosmont and Whitby during the summer.
* [http://www.westcoastrailways.co.uk/ West Coast Railways] operate timetabled steam trains between Fort William and Mallaig during the summer.   
* [http://www.westcoastrailways.co.uk/ West Coast Railways] operates timetabled steam trains between Fort William and Mallaig during the summer, but in practice these get fully booked well in advanceServices at the start of the 2024 season have been CANCELLED, because the operator no longer has authorisation to operate heritage carriages that lack central door locking.


Railways in Northern Ireland are owned by Northern Ireland Transport Holding Company (which remains state-owned) and are operated as the [http://www.translink.co.uk/Services/NI-Railways/ N I Railways] (NIR) division of Translink.
[http://www.swanagerailway.co.uk/ Swanage Railway] and West Coast Railways operated a service between Swanage and Wareham during the summer in 2017 and 2023.  In 2018 and 2019 there was just a limited Saturday service by the local franchisee, South Western Railway.  Swanage Railway does not plan further such services, on economic grounds.
   
   
All freight trains in Great Britain are operated by competing companies under "open access" conditions. The <i>principal</i> companies are: [http://www.rail.dbschenker.co.uk/rail-uk-en/start/ DB Cargo UK]  
All freight trains in Great Britain are operated by competing companies under "open access" conditions. The <i>principal</i> companies are:  
(formerly English Welsh and Scottish Railway, now a subsidiary of Deutsche Bahn of Germany); [https://www.freightliner.co.uk/ Freightliner] (owned by US railroad Genesee & Wyoming Inc); [http://www.colasrail.co.uk/ Colas Rail] (part of the Bouyuges group); [http://www.directrailservices.com/ Direct Rail Services] (owned by the Nuclear Decommissioning Authority); and [http://www.gbrailfreight.com/ GB Railfreight] (part of the Hector Rail Group). Direct Rail Services also operates a limited number of passenger trains for Northern Rail and for ScotRail.  DB Cargo UK, in particular, and GB Railfreight, to a lesser extent, operate charter passenger trains.  GB Railfreight also operates the Caledonian Sleeper trains on behalf of the franchisee, Serco Caledonian Sleepers Limited.
 
* [http://www.rail.dbschenker.co.uk/rail-uk-en/start/ DB Cargo UK] (formerly English Welsh and Scottish Railway, now a subsidiary of Deutsche Bahn of Germany)  
* [https://www.freightliner.co.uk/ Freightliner] (owned by US railroad Genesee & Wyoming Inc)  
* [http://www.colasrail.co.uk/ Colas Rail] (part of the Bouygues group);  
* [http://www.directrailservices.com/ Direct Rail Services] (owned by the Nuclear Decommissioning Authority)  
* [http://www.gbrailfreight.com/ GB Railfreight] (owned by Infracapital, an infrastructure equity investor).  
 
DB Cargo UK, in particular, and GB Railfreight, to a lesser extent, operate charter passenger trains.  GB Railfreight also operates the Caledonian Sleeper trains on behalf of Caledonian Sleeper Limited.
 
[https://www.railopsgroup.co.uk/ Rail Operations Group] concentrates on rolling stock moves for manufacturers, leasing companies and passenger operators, but started a parcels-carrying business, trading as [https://orion.railopsgroup.co.uk/ Orion] in 2021.
   
   
There are no longer any revenue freight trains in Northern Ireland.
There are no longer any revenue freight trains in Northern Ireland.


Neither the Isle of Man nor the Channel Isles (îles Anglo-Normands) is legally part of the UK but the Isle of Man's active railways and tramways are to  
Neither the Isle of Man nor the Channel Isles (îles Anglo-Normands) is legally part of the UK but the Isle of Man's active railways and tramways are to  
be found at the [http://www.heritagerailways.com/Visits_Map.php UK and Irish Heritage Railways website] and under [[#Trams|Trams]] respectively.
be found at the [http://www.heritagerailways.com/Visits_Map.php UK and Irish Heritage Railways website] and under [[#Trams/LRT-Systems|Trams/LRT-Systems]] respectively.


==Official Website==
==Official Website==
Line 35: Line 57:
==Language==
==Language==
English. In addition Welsh is spoken in most parts of Wales,  
English. In addition Welsh is spoken in most parts of Wales,  
and Gaelic is used to a limited extent in north-west Scotland.
and Gaelic is used to a certain extent in north-west Scotland.


==Currency==
==Currency==
Line 41: Line 63:
which are valid throughout the UK and usually accepted without question. Channel  
which are valid throughout the UK and usually accepted without question. Channel  
Islands and Manx notes (but not coins) are technically legal tender in the UK,  
Islands and Manx notes (but not coins) are technically legal tender in the UK,  
but are best changed at banks. There are several different designs of £1 coin,
but are best changed at banks.
but all are the same size, weight and colour.


==UIC code==
==UIC code==
* Great Britain: numeric 70; alpha GB (not used on rolling stock except for class 374 Eurostar trains and freight wagons authorised to operate through the Channel Tunnel or on the now-defunct train ferries).
* United Kingdom: numeric 70; alpha GB
* Eurotunnel: numeric 69 (used only for accounting purposes and not shown on rolling stock).
* Eurotunnel: numeric 69 (used only for accounting purposes and not shown on rolling stock).
Historically, the only British rolling stock to show UIC numbers were wagons passed to work on the now defunct train ferries from Harwich and Dover or through the Channel Tunnel.  The Eurostar class 374 trains, which entered service in 2015, were the first UK-registered passenger stock to have UIC numbers, otherwise known as the European Vehicle Number (EVN).  Rail Industry Standard RIS-2453-RST ''Vehicle Registration, Marking and Numbering'', introduced in December 2017, requires new vehicles in Great Britain to be identified by EVN.  On passenger vehicles only an abbreviated version is normally show.  UIC numbering is not used by NI Railways.


==Timetable==
==Timetable==
===Great Britain (England, Wales, Scotland)===
===Great Britain (England, Wales, Scotland)===
The official National Rail timetable is published on Network Rail's website (see below), twice yearly (in mid December, to meet an [http://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A32002D0844 EC directive], and mid May). Services on Mondays to Fridays, on Saturdays (or Mondays to Saturdays) and on Sundays are usually different and laid out separately in the timetable; there may be several alternative Sunday services, to allow for engineering work, during the currency of a timetable.  [http://www.barrydoe.co.uk/ Barry Doe] provides a comprehensive guide to printed and on-line public transport timetables.
The official National Rail timetable is published on Network Rail's website (see below), twice yearly (in mid December and mid May). Services on Mondays to Fridays, on Saturdays (or Mondays to Saturdays) and on Sundays are usually different and laid out separately in the timetable; there may be several alternative Sunday services, to allow for engineering work, during the currency of a timetable.  [http://www.barrydoe.co.uk/ Barry Doe] provides a comprehensive guide to printed and on-line public transport timetables.


====Journey Planner====
====Journey Planner====
Line 58: Line 81:


====Downloadable Timetable====
====Downloadable Timetable====
[https://www.networkrail.co.uk/running-the-railway/timetabling/electronic-national-rail-timetable-enrt/ electronic National Rail Timetable]
PDFs of the National Railway Timetable are available from the [https://www.networkrail.co.uk/running-the-railway/timetabling/electronic-national-rail-timetable-enrt/ Network Rail] website.  These are maintained for Network Rail by [https://timetables.fabdigital.uk/nrt/ Fabdigital] and the version on their website may be more up to date.


====Working (Staff) Timetables====
====Working (Staff) Timetables====
Line 68: Line 91:


====Printed Timetable====
====Printed Timetable====
<i>Rail Times for Great Britain</i> published by [https://www.middletonpress.co.uk/railtimes/ Middleton Press] is produced in two versions: ''Comprehensive Rail Times for Great Britain'' (the same as Network Rail's electronic National Rail Timetable) and ''Abbreviated Rail Times for Great Britain'' (Principal Stations on Main Lines and Rural Routes - the same as is found in the [http://www.europeanrailtimetable.eu/ European Rail Timetable]).  Train operators (apart from TfL Rail, operators of London - Shenfield local service) produce timetable leaflets or booklets for specific services, which should be available at relevant stations.
Since May 2020 there has been no comprehensive printed timetable for Great Britain and there are no printed timetable leaflets for most lines.


====Engineering Information====
====Engineering Information====
[http://www.nationalrail.co.uk/service_disruptions/currentAndFuture.html National Rail's future engineering works]  
[http://www.nationalrail.co.uk/service_disruptions/currentAndFuture.html National Rail's future engineering works]


===Northern Ireland===
===Northern Ireland===
Line 79: Line 102:


====Downloadable Timetables====
====Downloadable Timetables====
[http://www.translink.co.uk/Services/NI-Railways/Routes--Timetables/All-Timetables/ NIRailways Timetables]
[https://www.translink.co.uk/timetables?LocationId=&Name=&LocationType=&TransportMode=Bus&page=1 Translink bus and rail timetables]


====Printed Timetable====
====Printed Timetable====
Line 89: Line 112:
==Maps==
==Maps==
===Printed Maps===
===Printed Maps===
*The ''Rail Atlas Great Britain & Ireland'' by S.K. Baker gives detailed and accurate coverage of the UK railway system, and is widely available. It is mostly at 1:350,000, but with enlargements of many urban areas; an updated edition is published every 2-3 years.
*The ''Rail Atlas Great Britain & Ireland'' gives detailed and accurate coverage of the UK railway system, and is widely available. It is mostly at 1:350,000, but with enlargements of many urban areas; an updated edition is published every 2-3 years.
*[http://www.trackmaps.co.uk TrackMaps] publish a series of track diagrams (formerly Quail Track Diagrams) in regional volumes, based on the former British Rail regions.
*[http://www.trackmaps.co.uk TrackMaps] publish a series of track diagrams (formerly Quail Track Diagrams) in five regional volumes.
*Northern Ireland Railways are in a volume covering the whole of Ireland published by [http://www.quailmapcompany.free-online.co.uk/ Quail Map Co].
*Northern Ireland Railways are in a volume covering the whole of Ireland also published by [http://www.trackmaps.co.uk TrackMaps]
*Historic atlases have been published by various other publishers.
*Historic atlases have been published by various other publishers.


===Web-based Maps===
===Web-based Maps===
*Maps showing where the operators ply are at [http://www.barrydoe.co.uk/ Barry Doe's] (see National Rail Passenger Operators' map) and [http://www.projectmapping.co.uk Project Mapping] websites.
*Maps showing where the operators ply are at [http://www.barrydoe.co.uk/ Barry Doe's] (see National Rail Passenger Operators' map) and [http://www.projectmapping.co.uk Project Mapping] websites.
*Thorsten Büker's [http://bueker.net/trainspotting/maps_british-isles.php Map of British Isles and Ireland network].
*Thorsten Büker's [https://websites.umich.edu/~yopopov/rrt/railroadmaps/united_kingdom_ireland.html British Isles and Ireland Map]. Last updated December 2022
*[http://www.railmaponline.com/UKIEMap.php Rail Map online].
*[http://www.railmaponline.com/UKIEMap.php Rail Map online].


==Ticketing==
==Ticketing==
There is no distance-related fare tariff in the UK, and fares are charged on a market basis. Certain fares are regulated and the amount by which franchised train companies can increase some fares is specified by the Department for Transport.
There is no distance-related fare tariff in the UK, and fares are charged on a market basis. Certain fares are regulated and the amount by which train companies can increase some fares is specified by the Department for Transport.
 
Standard walk-on fares are high, but a wide range of discounted fares is available. These are subject to restrictions as to days and times when they can be used. It can be difficult to obtain accurate information as to fares and their availability, even from official enquiry offices, because the pricing structure is complicated and the different train companies are all making their own special offers. The most heavily discounted fares usually oblige the passenger to travel on specified trains (with no opportunity to alter these) - and only a limited number of tickets may be issued for each service.  Train operators are increasingly introducing special offers that can only be taken up through their website.  Higher fares are charged for use of domestic trains on HS1, the high-speed line to Kent, except for through tickets between Kent and destinations beyond London. 


Standard walk-on fares are high, but a wide range of discounted fares is available. These are subject to restrictions as to days and times when they can be used. It can be difficult to obtain accurate information as to fares and their availability, even from official enquiry offices, because the pricing structure is complicated and the different train companies are all making their own special offers. The most heavily discounted fares usually oblige the passenger to travel on specified trains (with no opportunity to alter these) - and only a limited number of tickets may be issued for each serviceTrain operators are increasingly introducing special offers that can only be taken up through their website.   
Tickets for any rail journey in the UK can be purchased from most train operators' websites, but the best price may be available from the operator whose service is being used. It is often possible to obtain a lower price for a journey by splitting it and buying a different ticket for each section. In such cases it is necessary to travel on a train that stops at stations where the validity of one ticket ends and another starts.  This requirement does not apply if at least one of the tickets is a season ticket, rail rover or similar.  It may also be found that a ticket to a station beyond one's destination is cheaper, but conditions need to be checked carefullyA break of journey may not be permitted, requiring an excess fare to be paid if exiting at an intermediate station.  Various websites act as 'consolidators' and will compare what is available in order to offer the best deal, including split ticketing options.   


Tickets for any rail journey in the UK can be purchased from any franchised operator's website, but the best price may be available from the operator whose service is being usedVarious other websites act as 'consolidators' and will compare what is available in order to offer the best dealIt is sometimes possible to obtain a lower price for a journey by splitting it and buying a different ticket for each section.  In such cases it is necessary to travel on a train that stops at stations where the validity of one ticket ends and another startsIt may also be found that a ticket to a station beyond one's destination is cheaper, but conditions need to be checked carefullyA break of journey may not be permitted, requiring an excess fare to be paid if exiting at an intermediate station.
Various Railcards are available, usually giving a fare reduction of one thirdThese are available nationally to groups, such as young people, families, senior citizens, two people travelling together, those with a disability and military personnel.  Some cards are available to all, but only valid for travel within a particular geographic areaThe cost of a Railcard may be recouped immediately if a long-distance journey is planned or if purchasing a high-price ticket such as a national rail roverSome Railcards only give a discount for off-peak travelDetails of Railcards are available at [https://www.nationalrail.co.uk/times_fares/National-Railcards.aspx National Rail].  Details can be found at the unofficial [http://www.railrover.org/ Rail Rover] website.


Overseas visitors should endeavour to purchase a rover ticket, such as a [http://www.britrail.net/ BritRail] or InterRail pass, before travelling to the UK. Various rail rovers are available within the UK, but they do not offer the value or wide validity of those available to foreign visitors.
Overseas visitors should endeavour to purchase a rover ticket, such as a [http://www.britrail.net/ BritRail] or InterRail pass, before travelling to the UK. Various rail rovers are available within the UK, but they do not offer the value or wide validity of those available to foreign visitors, and many are not valid until after the morning peak period.


In various areas where all stations have automatic ticket machines, including on the London Underground and most other tram and metro networks, a penalty fares system applies. Passengers found without a ticket are likely to have to pay a fine on the spot.
In various areas where all stations have automatic ticket machines, including on the London Underground and most other tram and metro networks, a penalty fares system applies. Passengers found without a ticket are likely to have to pay a fine on the spot.


There is only limited use of smart cards on the national rail system, but they are widely used in urban areas, particularly London. 
First class seating tends now to be found only on principal routes; in Northern Ireland it is limited to principal trains on the international route between Belfast and Dublin (where NIRailways call it &quot;First plus&quot; while partner Iarnród Éireann call it &quot;Premium&quot;). Eurostar maintain three classes: Standard, Standard Premier and Business Premier.  On some trains, including many of those operated by Gatwick Express, Great Northern and Southern, there is no difference between first class and standard class seating.  If a train including first class seats is used on a service advertised as standard class only, holders of standard class tickets may use the first class seats.
 
First class seating tends now to be found only on principal routes; in Northern Ireland it is limited to principal trains on the international route between Belfast and Dublin (where NIRailways call it &quot;First plus&quot; while partner Iarnród Éireann call it &quot;Premium&quot;). Eurostar maintain three classes: Standard; Leisure Select; Business Premier.  On some trains, including many of those operated by Gatwick Express, Great Northern, Southeastern and Southern, there is no difference between first class and standard class seating.  Some services advertised as 'standard class only' are operated by trains with first class accommodation; in such cases all passengers may use the first class seats.  This happens almost entirely in south east England.


==Infrastructure==
==Infrastructure==
Line 120: Line 143:


===Network Statement===
===Network Statement===
[https://www.networkrail.co.uk/industry-commercial-partners/information-operating-companies/network-statement/ Network Rail]. Enthusiasts may find [http://archive.nr.co.uk/aspx/10563.aspx Network Rail's Sectional Appendices] (by geographical areas known as ''Routes'') more useful.
[https://www.networkrail.co.uk/industry-commercial-partners/information-operating-companies/network-statement/ Network Rail]. The Sectional Appendices are available
[https://www.networkrail.co.uk/industry-commercial-partners/information-operating-companies/national-electronic-sectional-appendix/ here] (scroll down to list of PDFs).


[http://www.translink.co.uk/Corporate/About-Us/Publications/network-statement/ Translink]
[http://www.translink.co.uk/Corporate/About-Us/Publications/network-statement/ Translink]
Line 129: Line 153:


===Electrification===
===Electrification===
*Great Britain: Mostly 25 kV 50 Hz. 750 V dc third rail is used on some lines in south east England and around Liverpool.  The line between Pelaw and Sunderland is electrified at 1500V dc overhead, to allow use by Tyne & Wear Metro.
*Great Britain: Mostly 25 kV 50 Hz. 750 V dc third rail is used on some lines in south east England and around Liverpool.  The third rail network in south east England is by a considerable margin the most extensive such system in the world and the only place when conductor rail trains operate at up to 100 mph (160 km/hr).  The line between Pelaw and Sunderland is electrified at 1500V dc overhead, to allow use by Tyne & Wear Metro.  The line between Tinsley North Junction and Rotherham Parkgate is electrified at 750V dc overhead, for use by Sheffield Supertram. Most tramway systems are 750 V dc with Blackpool being 600 V dc.
*Northern Ireland: no electrified lines.
*Northern Ireland: no electrified lines.


Line 136: Line 160:


===Distances===
===Distances===
*Great Britain: <!---the best source is the [[#Network_Statement|Network Statement]] or---> <!---ALAS, ANNEXE D IS CURRENTLY UNAVAILABLE FROM THE LINK FROM NETWORK RAIL'S NETWORK STATEMENT--->[http://archive.nr.co.uk/aspx/10563.aspx Network Rail's Sectional Appendices] (by geographical areas known as ''Routes'').
*Distances are shown on Railway Track Diagrams published by [https://www.trackmaps.co.uk/ TRACKmaps]. Distances are also available in Network Rail's [https://www.networkrail.co.uk/industry-commercial-partners/information-operating-companies/national-electronic-sectional-appendix/ Sectional Appendices] (scroll down for list of available PDFs).
*Northern Ireland:
*Distances for Northern Ireland are also available on-line on the Signalling Record Society website:
**Railway Track Diagrams No. 6 Ireland published by the [http://www.quailmapcompany.free-online.co.uk/ Quail Map Co.]
**[https://www.s-r-s.org.uk/RailRef/ref-nc.php Derry and Larne lines]
**Distances are also available on-line:
**[https://www.s-r-s.org.uk/RailRef/ref-bd.php Bangor line]
***[http://www.s-r-s.org.uk/railref/ref-nc.html Derry and Larne lines]
**[https://www.s-r-s.org.uk/RailRef/ref-gd.php Dublin line]
***[http://www.s-r-s.org.uk/railref/ref-bd.html Bangor line]
***[http://www.s-r-s.org.uk/RailRef/ref-gd.html Dublin line]


==Other railways==
==Other railways==
Eurotunnel operates the Channel Tunnel under a long-term concession from the two governments. HS1 Ltd (owner of the link between London and the Channel tunnel) is held by private capital under a 30-year concession from the government. Heathrow Airport Holdings Limited owns the railway between Hayes & Harlington and London Heathrow Airport. Facilities exist for special through running between the national system and some tourist lines. British American Railway Services (a subsidiary of Iowa Pacific Holdings of the USA) operate two lines (Weardale Railway and Dartmoor Railway); both function principally as tourist lines.
*Core Valley Lines (Cardiff to Rhymney, Coryton, Merthyr Tydfil, Aberdare and Treherbert): Owned by the Welsh Government and managed by a lessee, Amey Keolis Infrastructure/Seilwaith Amey Keolis Limited.
*Crossrail Central Operating Section is the railway under Central London from Portobello Junction (Royal Oak) to Pudding Mill Lane Junction (Bow) and Abbey Wood.  It is managed by Rail for London (Infrastructure) Limited, whose ultimate owner is Transport for London.
*East London Line: Owned by Rail for London Limited, whose ultimate owner is Transport for London.
*Eurotunnel: A partnership between the Channel Tunnel Group Limited and France-Manche S.A. that operates the Channel Tunnel under a long-term concession from the UK and French governments.  
*Heathrow Airport Holdings Limited owns the railway between London Heathrow Airport and the junction with the Great Western Main Line near Hayes & Harlington. 
*HS1 Ltd: The investor with a 30 years concession from the UK government to operate the high-speed line between London and the Channel Tunnel, though most aspects of day-to-day operation and maintenance are contracted out to Network Rail.  
 
Facilities exist for special through running between the national system and some tourist lines.


==Tourist lines==
==Tourist lines==
A current listing of UK and Irish heritage railways can be found at the [http://www.heritagerailways.com/Visits_Map.php UK and Irish Heritage Railways website].
A map of UK heritage railways can be found at the "Heritage Rail - UK & Ireland" link on the [https://www.heritagerailways.com Heritage Railway Association website].


==Metro==
==Metro==
London, Newcastle,  
London, Newcastle, Glasgow. Although part of the national railway system, the Merseyrail Electrics  
Glasgow. Although part of the national railway system, the Merseyrail Electrics  
network in Liverpool is like a Metro. There are two separate networks in London.  The Underground system is 630V dc third and fourth rail; the Docklands Light Railway is a fully-automated 750V dc third rail system. London Overground operates under a contract let by the Mayor of London and uses Transport for London branding, but operates almost entirely on Network Rail linesThe Glasgow and Merseyrail systems are third  
network in Liverpool is like a Metro. There are two separate networks in London.  The Underground system is 660V dc third and fourth rail; the Docklands Light Railway is a fully-automated 750V dc third rail system.  Glasgow and Merseyrail are third  
rail and Newcastle is 1500 V dc overhead. Glasgow Subway is 4 feet (1,219mm) gauge and was originally cable-worked.  There are several lines where London Underground and main line trains share the same tracks. The Tyne & Wear Metro (Newcastle) operates to Sunderland over the Network Rail line from Pelaw.
rail and Newcastle is 1500 V dc overhead. Glasgow Subway is 4 feet (1,219mm) gauge and was originally cable-worked.  There are several lines where London Underground and  
 
main line trains share the same tracks. The Tyne & Wear Metro (Newcastle) operates to Sunderland over the Network Rail line from Pelaw. London Overground is part of the
The Core Valley Lines from Cardiff are being converted to a form of metro system.
national system on which the franchising has (in effect) been devolved to the
Mayor of London.


==Trams==
== Trams/LRT-Systems ==
Birmingham/Wolverhampton (Midland Metro), Blackpool, Croydon, Edinburgh,
Birmingham/Wolverhampton (Midland Metro), Blackpool, Croydon, Edinburgh,
Llandudno (cable worked), Manchester, Nottingham, Seaton (Devon) and Sheffield. The Croydon,  
Llandudno (cable worked), Manchester, Nottingham, Seaton (Devon) and Sheffield. The Croydon,  
Manchester, Midland Metro, Nottingham and Seaton systems include extensive running over  
Manchester, Midland Metro, Nottingham and Seaton systems include extensive running over  
routes that were previously part of the national railway system. The Manchester and Nottingham systems have been considerably extended in recent years and an extension of Midland Metro in Birmingham city centre came into use in 2016A second route through Manchester city centre will enter service during spring 2017 and a Transport & Works Act Order has been granted for a branch to Trafford Park.
routes that were previously part of the national railway system. The Manchester and Nottingham systems have been considerably extended in recent years.  On the Manchester Metrolink system a second route through Manchester city centre came into use on 26 February 2017, and the 5.5 km Trafford Park line opened on 22 March 2020.  The Midland Metro in Birmingham was extended to Edgbaston on 17 July 2022 and to Wolverhampton Station on 17 September 2023. The first stage of a line to Brierley Hill is expected to open, to Dudley, in 2024.  The extension of the Edinburgh line to Leith and Newhaven opened on 21 June 2023 and plans have been announced for further lines in the city.  The Blackpool system Talbot Gateway extension, to Blackpool North station, is expected to be fully open in 2023.  A metro system is proposed in Glasgow, but this project is at a very early stage.  


The Seaton and Llandudno lines are essentially tourist operations, and both are narrow gauge.  
The Seaton and Llandudno lines are essentially tourist operations, and both are narrow gauge.  
There are other tourist lines of a mile or more at the National Tramway Museum  
There are other tourist lines of a mile or more at the National Tramway Museum  
(Crich, near Matlock) and at Beamish Open Air Museum (near Gateshead), plus  
(Crich, near Matlock) and at Beamish Open Air Museum (near Gateshead), plus  
several other shorter lines. The Manx Electric Railway is a narrow-gauge inter-urban line. 
several other shorter lines.  


After a period of uncertainty, the horse tramway along the promenade in Douglas, Isle of Man will operate in 2017. Road works thereafter will require the line to be partly singled and may involve temporary closure while the work is undertaken. However, the threat that the line might be shortened seems to have been seen off by a vote in Tynwald in January 2017.
The Isle of Man has three narrow gauge tramways, which operate on a seasonal basis: Douglas Bay Horse Tramway - along the promenade in Douglas; the Manx Electric Railway - an inter-urban line between Douglas, Laxey and Ramsey; and the Snaefell Mountain Railway - from Laxey to Snaefell Summit.  
After a period of uncertainty, the threat that the horse tramway line in Douglas might be shortened seems to have been seen off by a vote in Tynwald (the Manx parliament) in January 2017.  


The Tinsley Chord, which will connect the Sheffield tram system to a freight line near Meadowhall is under construction; Sheffield City Region Combined Authority Transport Committee expect it to be in use by summer 2018, allowing trams to run between Sheffield city centre and Rotherham.  The trams will operate at 25kV between Meadowhall and Rotherham.
The Tinsley Chord, which connects the Sheffield tram system to a freight line near Meadowhall, allows tram-trains to run between Sheffield city centre and Rotherham Parkgate over Network Rail linesPublic services commenced on Thursday 25 October 2018.  Sheffield tram-trains are dual voltage vehicles that can run on the 750 V Overhead Lines (OHLE) of the tram network and the 25 kV OHLE of the national rail network; however the line to Rotherham Parkgate is initially energised at 750 V because there is no 25 kV electrification in the area.


Track plans for most of the significant tram systems in the United Kingdom are available on the [http://www.railwaycodes.org.uk/track/diagrams0.shtm Railway Codes site].
Track plans for most of the significant tram systems in the United Kingdom are available on the [http://www.railwaycodes.org.uk/line/diagrams0.shtm Railway Codes site] and also on the [https://www.gleisplanweb.eu/index-e.php Gleisplanweb site].


==Recent and Future Changes==  
==Recent and Future Changes==  
Most aspects of national railway operations are privatised, but infrastructure ownership has reverted to the public sector.  There continues to be debate about the fragmented, expensive and complex nature of the system that has emerged, under the general oversight of the Department for Transport.
Some aspects of national railway operations are privatised, but infrastructure ownership has reverted to the public sector.  There continues to be debate about the fragmented, expensive and complex nature of the system that has emerged, under the general oversight of the Department for Transport.
   
   
===Route Closures and Service Reductions===
===Route Closures and Service Reductions===
Having undergone extensive cut backs in the 1960s, the present passenger network seems relatively secure. The closure of a passenger railway in the UK currently involves a lengthy legal process, and short-notice closures usually occur only if there is a sudden and dramatic infrastructure failure,or if the closure is deemed a &quot;minor closure&quot;.  Passenger services via, or in connection with those through, the Channel Tunnel do not enjoy statutory protection from closure.  
Having undergone extensive cut backs in the 1960s, the present passenger network seems relatively secure. The closure of a passenger railway in the UK normally involves a lengthy legal process, and short-notice closures usually occur only if there is a sudden and dramatic infrastructure failure, or if the closure is deemed a &quot;minor closure&quot;.  However, a number of stations have closed and all passenger services over some lines have been withdrawn without the statutory procedure having been followed.  Passenger services via the Channel Tunnel, or in connection with them, do not enjoy statutory protection from closure.


Some routes have been reduced to just one or two trains per day (or, in some cases, per week) in order to reduce operating costs without having to go through the closure procedure. These are included in the list of [http://www.psul4all.free-online.co.uk/intro.htm sparse services].
Some routes have been reduced to just one or two trains per day (or, in some cases, per week) in order to reduce operating costs without having to go through the closure procedure. These are included in the list of [https://www.egtre.info/wiki/United_Kingdom_-_Lines_with_Obscure_or_Sparse_passenger_services sparse services].


A newly-introduced passenger service can be designated as "experimental" for a period up to five years, during which time it may be withdrawn without the usual closure procedure needing to be followed.  The passenger service between Yeovil Pen Mill and Yeovil Junction is "experimental" for five years from 13 December 2015.
A newly-introduced passenger service can be designated as "experimental" for a period up to five years, during which time it may be withdrawn without the usual closure procedure needing to be followed.  The only "experimental" service at present is Thanet Parkway station, until 30 July 2028.


====Passenger services to be withdrawn====
* The railway between Nottingham and Worksop may be diverted at Whitwell to allow expansion of a dolomite quarry.  This will eliminate Whitwell Tunnel.  No date is set for this, but planning permission to expand the quarry was granted in 2018.


'''Passenger services to be withdrawn:'''
* Planned diversion of trains between Belfast and Dublin to a new terminal facility - [http://www.translink.co.uk/Translink-Footer/the-hub/ the Belfast Hub] - being constructed close to Belfast Great Victoria Street may see the end of regular passenger services between Central Junction (Adelaide) and City Junction (City Hospital).


Hythe Pier Tramway, which operates in connection with the ferry to Southampton, may close because of declining use.  This line is noteworthy for using electric locomotives built in 1917, which are believed to be the oldest locomotives in all-year daily use (i.e. neither occasional nor seasonal) anywhere in the world.
====Closures and significant service reductions in recent years are====
The London Underground service between Croxley and Watford will be withdrawn on opening of the Croxley rail link, which will divert services to Watford High Street.  This is not expected to happen until 2020 at the earliest.


Planned diversion of trains between Belfast and Dublin to a new terminal facility - [http://www.translink.co.uk/Translink-Footer/the-hub/ the Belfast Hub] - to be constructed close to Belfast Great Victoria Street may see the end of regular passenger services between Central Junction (Adelaide) and City Junction (City Hospital).
'''Passenger service withdrawn, line still open for other than regular passenger traffic:'''


* Greenford LUL Bay Junction - Northolt Junction: The Wednesdays only train from West Ealing to West Ruislip ran for the last time on 7 December 2022.


'''Closures and significant service reductions in recent years are:'''
* Cowlairs East Junction - Cowlairs North Junction (Glasgow): The summer Sunday trains between Edinburgh and Oban have started and terminated at Glasgow Queen Street since 2023.  Last use of the curve by the ScotRail service was on 28 August 2022.  It continues to be used by the [https://www.belmond.com/trains/europe/scotland/belmond-royal-scotsman/journeys Royal Scotsman] Western Scenic Wonders tour.


'''Lines closed:'''
* Barking Station Junction - Barking platform 1: No regular passenger traffic from 18 July 2022, when the line to Barking Riverside opened, but occasional diversions may be possible.


Barkston South Junction - Barkston East Junction (replaced by new curve at Allington, October 2005)
* Dalmeny - Winchburgh Junction: Service withdrawn 23 March 2020, but without the statutory closure procedure having been followed. 


Farringdon - Moorgate, London (March 2009; the London Underground line between the same stations is not affected)
'''Significant service reduction'''


Fawkham Junction - Southfleet Junction (Regular passenger used ceased in November 2007, as a result of Eurostar services being diverted from London Waterloo to St Pancras.  The line was converted to sidings, accessed only from Southfleet Junction, in April 2016, possibly temporarily)
* Glenrothes with Thornton - Thornton South Junction: The frequent service via Dunfermline and Kirkcaldy became Sundays only, except for one train each way Mondays to Fridays, with effect from 15 May 2022.


====Temporary Closures:====


'''Lines closed for conversion to rapid transit or other alternative transport use:'''
Work to upgrade the UK rail network is increasingly leading to lines being closed for extended periods.  Severe weather and the age of much railway infrastructure has resulted in more temporary closures caused by landslips and other problems with earthworks.  Current and planned temporary closures of four weeks or more, in approximate order of expected re-opening, are:  


Stratford - North Woolwich, London (December 2006; part being converted to part of Docklands Light Railway and the remainder as part of Crossrail's Abbey Wood line)
* Shipley (Dockfield Junction) to Guiseley (Esholt Junction): From 8 February 2024 until 24 April 2024 or later, because of a major land slip.
* Chinley (New Mills South Junction) to New Mills Central: from 26 March 2024 until 6 May 2024 or later, because of a bank slip west of New Mills Central (single line working is in operation past the slip, but the reduced track capacity requires the closure of the line east of New Mills Central).
* Ayr to Stranraer and Kilmarnock to Barassie: From 25 September 2023 until 2 June 2024 or later, because of a dangerous building at Ayr.
* Blackheath to Charlton: 1 June to 10 August 2024, for repairs to Blackheath Tunnel.
* Ashford East Junction, connection to HS1: Eurostar ceased calling at Ashford on 19 March 2020 and will not resume before 2025/6.


Manchester - Oldham - Rochdale (October 2009; most is now part of Manchester's tram/metro system, but that has street running through Oldham, following an interim period when trams used a now-closed section of the former railway)
===Re-openings and Openings===


Most projects involve upgrading existing routes, but some openings have occurred or are about to do so.


'''Passenger service withdrawn, line still open:'''
====New and reinstated passenger services in recent years:====


Lisburn - Antrim (June 2003, on diversion of passenger trains via Bleach Green Junction)
New passenger services are:


Maindee curve, Newport, Gwent (December 2005)
* Kirkcaldy (Thornton North Junction) - Leven (scheduled to open on 2 June 2024)


Newhaven Marine Station (Service suspended August 2006 because of the alleged unsafe condition of the platform canopy)
* West Midlands Metro Extension: The Royal - Wolverhampton Station (17 September 2023)


Nine Elms Junction - Linford Street Junction (November 2007, as a result of Eurostar services being diverted from London Waterloo to St Pancras)
* Westbourne Park Junction - Paddington and Stepney Green Junction - Pudding Mill Lane Junction (full opening of Elizabeth line) (6 November 2022)  


Reading West Junction - Oxford Road Junction (summer Saturday service last ran September 2008)
* Barking - Barking Riverside (18 July 2022)


Acton Main Line - Willesden West London Jn (Cross Country Brighton services withdrawn December 2008)
* West Midlands Metro Extension: Library - Edgbaston Village (17 July 2022)  


[Kensington Olympia - ] Latchmere Junction - Longhedge Junction [ - Wandsworth Road] (June 2013)
*Paddington - Abbey Wood (Elizabeth line) (24 May 2022)


Westbury East Loop Junction - Hawkeridge Junction (May 2016, when the experimental service of one train each day, Monday to Friday, non-stop between Reading and Bath Spa ceased)  
* Newport (Gaer Junction) - Pye Corner (Park Junction) (on introduction of trains between Newport and Crosskeys, 12 December 2021)


* Crediton - Okehampton (20 November 2021; there was previously a service on summer Sundays)


'''Regular passenger service replaced by a very limited one:'''
* Kennington - Battersea Power Station (London Underground, Northern Line extension, opened September 2021)


Darlaston Jn - Pleck Jn [Walsall] (reduction to one Walsall to Wolverhampton train, December 2008)
A daily service, generally hourly, was introduced between Liverpool Lime Street and Chester via Runcorn and Frodsham on 19 May 2019. Previously the curve between Halton Junction and Frodsham Junction had been used by a single unadvertised train in one direction only on summer Saturdays.
   
Trowell Junction - Trent Junction (reduction to 2 or 3 trains a week from December 2008)


Stechford - Aston (closure of open-access operator Wrexham & Shropshire in January 2011)
On tourist / heritage railways:


[Wandsworth Road - ] Factory Junction - Battersea Park (reduced to one and a half round trips in December 2012)
* Llangollen Railway extended passenger services from Carrog to a provisional terminus at Corwen in October 2014 and to the permanent terminus in June 2023.
* the Mid-Norfolk Railway ran inaugural passenger trains to Worthing level crossing (North Elmham) on 19 and 20 May 2018, but regular services continue to terminate at Dereham.  The railway aspires to continue to County School. 
* The first (very short) section of the Aln Valley Railway officially opened in October 2013, from a new station on the edge of Alnwick, with a longer run available from December 2017.  It is planned that the railway will reach the National Rail station at Alnmouth.
* The first section of the re-opened Lynton & Barnstaple Railway, a narrow gauge line, is in operation between Woody Bay and Killington Lane.  Extensions towards Lynton and to Blackmoor Gate are planned as the next phase of reconstruction.


[Holytown - ] Mossend East Junction - South Junction [ - Motherwell] (reduced to single round trip in December 2014, and subsequently reduced to one journey in one direction only)
====Projects authorised or under construction are:====


Wishaw - Holytown (December 2014)
Work is under way to re-open the railway between Kirkcaldy (Thornton North Junction) and Levenmouth for passenger services on 2 June 2024.  Initially, all trains will run via Kirkcaldy, but it is expected that some trains will later run via Cowdenbeath, providing many more via the curve from Thornton West Junction than the current sparse service.


===Stations at Airports===
A Transport & Works Act Order for the introduction of passenger trains over the freight line to Ashington was granted in June 2022 and the line is due to open by December 2024. The UK Government has announced plans to re-open the railway to Fleetwood, but this may become a tramway.  The UK Government is also funding feasibility studies into re-opening a number of other lines, but these are at a very early stage.  
In addition to airports served by stations on through lines, branch lines or extensions have been opened over recent years and now serve airports at London Stansted, Manchester, Newcastle and London Heathrow (where Heathrow Express/HeathrowConnect and London Underground have three separate pairs of stations: Terminals 1-2-3, Terminal 4 and Terminal 5).


===Electrification===
Work has started on construction of a high speed railway (HS2) from London to Birmingham, but the line will not be opened until 2026 at the earliest.  A flythrough of the route is [https://www.youtube.com/watch?v=1bkoGvw9kbA here]. There will be a link to the West Coast Main Line at Handsacre, near Lichfield.  Plans to extend the line to Manchester and beyond have been cancelled by the UK Government.
Main line electrification in Great Britain had been virtually at a standstill, because private sector train operators and rolling stock companies preferred the flexibility of diesel traction. The most recent schemes had been the line between Crewe and Kidsgrove (near Stoke on Trent) (electrified for diversionary use), the reconstructed Larkhall branch line in Scotland and High Speed 1 (the Channel Tunnel rail link) [see below].


In 2009 DfT policy shifted towards extending electrification, with significant schemes proposed and some implemented.  However, greatly increased costs, partly due to more stringent safety standards, have resulted in projects being curtailed and delayed.  There has been a shift to provision of bi-mode trains, which are electric trains that can operate on non-electrified lines using auxiliary diesel engines or batteriesThis means that the electrified network need not be so extensive.
<!---Preliminary work on construction of a link between the LUL Watford branch and the former Croxley Green branch  was undertaken in 2016.  However, the project has stalled, because of lack of agreement as to how further cost escalation would be funded, and can only be regarded as definitively dead, though there has been no formal announcement to this effect.  Should the scheme continue, which seems increasingly unlikely, it will result in the closure of Watford LUL station, but the re-opening of most of the Croxley Green branch.--->
Plans were being developed for a second Crossrail line, linking south west and north east London.  All work on this stopped in autumn 2020, as a result of economies made to deal with the Covid pandemicIt is questionable whether the scheme will be revived, if there is the expected permanent reduction in commuter traffic.  


Schemes recently completed  or under way in England and Wales are:
Work is under way to re-open the derelict line between Calvert and Bletchley.  A Transport & Works Act Order for this scheme was granted in February 2020 and services between Oxford and Milton Keynes are scheduled to start in December 2024.  The longer-term objective is to re-introduce trains between Oxford and Cambridge. 


Manchester - Newton-le-Willows (December 2013)
[https://heathrowrail.com/ Heathrow Southern Railway] intends to build a new railway south-west from Heathrow Airport to link with the Staines to Windsor line, together with a branch to Virginia Water or Chertsey. 


Earlestown - Edge Hill (March 2015)
In the private sector:
* The Leadhills & Wanlockhead Railway is constructing an extension from Glengonnar to Wanlockhead.
* Moorland & City Railways have a stated intention to reopen the line between Stoke-on-Trent and Leek Brook Junction, to a junction with the Churnet Valley Railway, but progress seems to be languishing.
* Most ambitiously, the two Great Central Railways at Loughborough are being linked by means of a reinstated bridge over the Midland Main Line.
* The Rother Valley Railway has obtained a Transport and Works Act Order to rebuild the railway between Robertsbridge and Junction Road (Bodiam).
* The Royal Deeside Railway is extending its line to Crathes West Lodge.
* Strathspey Railway is extending to Grantown-on-Spey and during summer 2014 and 2015 offered a limited service between its normal terminus at Broomhill and the river bridge at Dulnain.  Further work depends on obtaining statutory powers under the Transport and Works Act and constructing a new bridge to carry the railway over the A95 main road. 
* The Helston Railway provides a short ride near Prospidnick, but plans to extend to Helston and eventually to Gwinear Road.


Huyton - Wigan via St Helens (May 2015)
===Electrification===


Work is under way between Manchester and Blackpool North via Bolton and Preston, between Walsall and Rugeley Trent Valley and between Gospel Oak and Woodgrange Park via South Tottenham.  Meadowhall to Rotherham is being electrified in connection with the Sheffield tram-train scheme (see under Trams, above). A major project for electrification of the Great Western lines from London Paddington has been particularly subject to delays and significant cost increase. Priority is being given to completing electrification between London and Cardiff.  It is not clear when, or if, other elements of the scheme, including electrification to Bristol, Swansea, Oxford, Newbury and the Thames Valley branch lines will be completed.  
Main line electrification in Great Britain came to a virtual standstill following railway privatisation, because private-sector train operators and rolling stock companies preferred the flexibility of diesel traction. The only schemes to proceed were between Crewe and Kidsgrove (near Stoke on Trent) (electrified for diversionary use), the reconstructed Larkhall branch line in Scotland and High Speed 1 (the Channel Tunnel rail link) [see below].


Approval in principle has been given to electrification of the Windermere branch and that section of the East West Rail Project (see below) between Oxford and BedfordIt is also planned to electrify the line from Manchester to Huddersfield, Leeds and York and the Midland Main Line north from BedfordWhen these schemes will proceed, and whether they do at all, is unclear.  
In 2009 Department for Transport policy shifted towards extending electrification, with significant schemes proposed and a few implemented.  However, greatly increased costs have resulted in projects being curtailed and delayed.  Poor cost estimating, increased safety standards, over-specification and loss of practical experience of electrification appear to be among the causesIn July 2017 the UK Government announced an end to plans for further railway electrification in England and Wales, with reliance instead on bi-mode diesel/electric trainsThis will included converting some electric multiple-units to bi-mode working.  There have also been experiments with battery operation.  In contrast, the Scottish Government required Network Rail to develop an electrification technical specification that can deliver an "efficient and affordable rolling programme of electrification".


The Welsh Government is sponsoring electrification of the Valley Lines from Cardiff (to Merthyr, Aberdare etc), which is to be jointly-funded with the UK Government.  This may involve conversion to a form of light rapid transit.
Electrification schemes recently completed in England and Wales are:


Following the re-opening and electrification of lines to Larkhall and through Bathgate, the Scottish Government is funding wholesale electrification in the central lowlands, with work complete thus:
* Bedford to Corby (May 2021)


Glasgow (Shields Junction) - Paisley Canal (November 2012)  
* London (Heathrow Airport Junction) to Cardiff, Chippenham (Christian Malford) and Newbury (Phased introduction of electric services between May 2017 and January 2020).  The scheme was cut back to omit Swansea, Bath Spa, Bristol Temple Meads, Oxford and the Thames Valley branch lines.


Cumbernauld - Springburn and to Mossend (Motherwell) (May 2014)  
* Walsall to Rugeley Trent Valley (May 2019)


Rutherglen - Whifflet (December 2014)  
* Manchester to Preston via Bolton (February 2019)


Electrification work is under way between Edinburgh and Glasgow Queen Street via Falkirk and will continue to cover Cumbernauld to Stirling, Dunblane and Alloa; and Holytown to Kirknewton via Shotts.  There have been calls for further electrification in Scotland, particularly to Aberdeen and Tweedbank, but cost increases put this in doubt.
* Gospel Oak to Woodgrange Park via South Tottenham (January 2019, but limited electric service initially, because of delayed delivery of rolling stock)


===Infrastructure Upgrades===
Schemes under way in England:
Major work has been carried out to upgrade the West Coast Main Line, including the London to Manchester route, for 125 mph running (although the tilting Pendolino trains will not be able to reach their design maximum speed of 140 mph). The scheme included the construction of additional running lines on parts of the Trent Valley section in Staffordshire.
The first 70km section of the Channel Tunnel rail link, between Dollands Moor and Southfleet Jn, opened to passengers on 28 September 2003 and the 40km second phase, between Southfleet Jn and London St Pancras International, opened on 14 November 2007. The whole CTRL is now dubbed HS1 (&quot;High Speed 1&quot;). Internal services between London St.Pancras International and destinations in Kent commenced on a trial basis from June 2009, and in full service from December 2009.  Higher fares are charged for journeys to and from London via HS1, but not for those between Kent and places beyond London.


The High Speed Rail (London - West Midlands) Act 2017 gives powers to construct a high speed railway (HS2) from London to Birmingham, but the line will not be completed until 2026 at the earliest.  It is intended that the line will be extended to Manchester and Leeds, opening in the mid-2030s.  A second Crossrail line, linking lines in North East and South West London, is being designed so that a parliamentary act for its construction can be sought.
* Kettering - Market Harborough


The main line between Belfast and Dublin has been upgraded, and new and faster trains provided. This service is operated jointly by NIR and Iarnród Éireann.
* Manchester - Huddersfield - Leeds - York


===Re-openings and Openings===
* Wigan North Western - Lostock Junction (near Bolton) (announced 1 September 2021, expected completion 2024/2025)
Most projects involve upgrading existing routes, but some re-openings have occurred or are about to do so.


====New and reinstated passenger services in recent years are:====
The UK Government has announced that electrification of the Midland Main Line is to be completed to Nottingham, Derby and Sheffield.


Whiteabbey (Bleach Green Junction) - Antrim (June 2003)
The Welsh Government is sponsoring electrification of the Valley Lines from Cardiff to Bargoed, Coryton, Merthyr Tydfil, Aberdare and Treherbert.  Light rail vehicles are to be used from Cardiff to Coryton and on routes via Radyr.  Tri-mode trains will be used from Rhymney to Penarth, Barry Island and the Vale of Glamorgan line, using battery power between Rhymney and Bargoed, and diesel south of Cardiff. 


Maryhill - Anniesland (September 2005)
Following an extensive programme of electrification completed between 2012 and 2019, most lines in Central Scotland are electrified, with recent schemes comprising:


Hamilton - Larkhall (December 2005)  
*Holytown to Kirknewton (Midcalder Jn) via Shotts (Some electric services April 2019, full service May 2019)  


Ebbw Vale Parkway - Cardiff (February 2008) (a link to Newport should reopen later)  
*Glasgow Central (Muirhouse Central Jn) to Barrhead (December 2023, but most trains continue to Kilmarnock or beyond, so remain diesel-worked)


Stirling - Alloa (May 2008)
The line from Falkirk to Grangemouth has also been electrified for freight traffic, but there are proposals to reinstate a passenger service.


Kettering - Corby - Manton Junction [Melton Mowbray] (April 2009, limited service Kettering - Corby from February 2009)
Work has started on electrification to East Kilbride.  The line from Haymarket (Edinburgh) to Dalmeny is being electrified as the first phase of a scheme to electrify routes through Fife.  Transport Scotland's [https://www.transport.gov.scot/publication/rail-services-decarbonisation-action-plan/ ''Rail Services Decarbonisation Action Plan''], published in July 2020, envisages most lines in Scotland being electrified.  Priorities are the Kilmarnock line; Edinburgh to Tweedbank; routes in Fife;  and Dunblane to Aberdeen.  Later extensions will take electrification to Girvan; Gretna via Dumfries; and Inverness to Perth, Aberdeen and Tain.


Drumgelloch - Bathgate (December 2010)
===Older Changes===
For details of changes more than five years ago see [[United_Kingdom - Older General Information]].


Ebbw Vale Parkway - Ebbw Vale Town (May 2015)
==Special Notes==
 
Todmorden Curve (allowing trains to run direct between Todmorden and Burnley Manchester Road) (May 2015)
 
Newcraighall - Tweedbank (Borders Railway) (September 2015)


Bicester: Curve allowing trains to run between London Marylebone and Oxford (October 2015) (until 10 December 2016 trains ran only as far as Oxford Parkway, for bus connection to Oxford)
Train numbers in Great Britain follow an alpha-numeric format, thus 1A22.  The first digit indicates the type of train (passenger trains are 1, 2 or 9), in most cases the letter indicates its route or destination and the remaining digits identify the particular train.  Different trains can and do use the same number, so long as they do not conflict geographically or operate several hours apart.  Since December 2021 train numbers have been shown in the National Rail Timetable, but they are not normally used for passenger information purposes.  It is more usual for trains to be referred to by their schedule, for example as the "10:00 London King's Cross to Aberdeen".  International trains have four digit numbers where the second figure is 0 or 1, which can be treated as letters O and I in the UK.


Yeovil Junction - Yeovil Pen Mill (December 2015)
Departure sheets listing trains from a station in chronological order are rarely used. The usual format is to list destinations in alphabetic order, and provide details of all trains to each, or to provide timetable posters. Most stations have electronic displays, which indicate all departures (and often arrivals) within the next hour or so.


The line between Stratford and Tottenham Hale regained a regular interval service in December 2005 after a period with very few trains.
It is unusual for information displays and announcements at stations and on trains to be in any language other than English (and Welsh in Wales), though most station name signs in Scotland appear in Gaelic as well as English.  Multi-lingual information is normally restricted to dedicated airport services and those using the Channel Tunnel.


The Docklands Light Railway extended to Woolwich Arsenal in January 2009 and to Stratford International in August 2011. The first phase of the resuscitated East London line (partially reopened/partially new construction) opened in April 2010, with full service extending into south London the following month, and to Highbury & Islington in February 2011; the links from Surrey Quays to the South London line and between Wandsworth Road and Clapham Junction reopened in December 2012.  Since December 2011 the curve from Slade Green to Barnehurst (Perry Street Fork Junction), which had previously had a limited service, has been used by trains for most of the day, Mondays to Fridays.
No stations sell international tickets or can make international reservations, though there are facilities to make through bookings from certain stations by Eurostar<!---International tickets and reservations are available at the We Know London Tourist Services desk in the shopping mall at St Pancras International station.---> Even the range of tickets available from Eurostar is very limited. For guidance on booking travel to and from Europe visit [http://www.seat61.com/Europe.htm#How%20do%20I%20book? The Man in Seat Sixty-One]'s website or see advice from [https://www.nationalrail.co.uk/stations_destinations/European-Train-Travel.aspx National Rail].
 
Remodelling the railway at Reading has included construction of a new dive-under from the Wokingham line to the north side of the station, with a limited passenger service, a flyover west of the station used by fast trains to and from Didcot and an alternative route between Reading West and the north side of Reading station.
 
A number of new curves and flyovers have been built, in order to increase network capacity by reducing conflicting movesA flyover at Nuneaton, partly new work and partly re-opening a closed line, came into use in 2006.  This avoids the need for trains between the Birmingham area and Leicester to cross the West Coast Main Line on the flat.  Others include a flyover at Hitchin, used by most passenger trains towards the Cambridge line, which came into use in 2013.  New curves north of Ipswich, north of Doncaster and north of Nuneaton (the latter independent of the flyover) are normally used only by freight trains.  A new flyover to and from the Stoke-on-Trent line at Norton Bridge and a new down slow line towards Crewe came into use in March 2016. 
 
Through trains are expected to run on a seasonal basis between Swanage and Wareham from 2017.
 
The [http://www.festrail.co.uk/whr_history_3.htm Welsh Highland Railway] - 2ft. gauge, closed in 1937 - has been rebuilt and extended to run between Caernarfon and Porthmadog (25 miles). The final section - including a flat crossing with the standard gauge line in Porthmadog, to effect a link with the Ffestiniog Railway - opened in April 2011. Extension of the [http://www.bluebell-railway.com/splash/index.php Bluebell Railway] from Kingscote to East Grinstead in 2013 completed a restoration of a link with the national network.  The [http://www.gcrailway.co.uk/the-railway/the-mountsorrel-branch/ Mountsorrel branch], off the Great Central Railway, opened in autumn 2015 for occasional trains only, with the possibility of regular services at some date.
 
====Projects authorised or under construction are:====
 
Thameslink route through central London is being upgraded.  A new station has been opened at St Pancras International and a link to the East Coast Main Line was commissioned in 2016.  Work is currently under way to rebuild London Bridge station and lines between Blackfriars Junction and New Cross Gate are being extensively remodelled. The project is due for completion in 2018, when passenger use of the link to the East Coast Main Line will commence.
 
Crossrail (now known as the "Elizabeth Line") is a new line, almost entirely in tunnel, linking the railways from Paddington and from Liverpool Street, with a branch from Whitechapel to Abbey Wood.  Trains are due to start running between Abbey Wood and Heathrow Airport in December 2018.  The Shenfield service will run initially to Liverpool Street and not through the cross-London tunnels until December 2019.
 
A service between Oxford and Bedford, re-opening the line between Bicester and Fenny Stratford, has been approved in principle.  The Department for Transport intends that this is carried out by a by a new organisation, [http://www.eastwestrail.org.uk/ East West Rail], that will deliver the design, construction and operation of the railway.  A Transport and Works Act Order needs to be obtained. 
 
Work has started on construction of the Ordsall Curve in Salford, which will allow passenger trains to run direct between Deansgate and Manchester Victoria.
 
Preliminary work on construction of a link between the LUL Watford branch and the erstwhile Watford - Croxley Green branch started in January 2016.  This will result in the closure of Watford LUL station, but the re-opening of most of the Croxley Green branch, no earlier than 2020.  Work has started on construction of a branch of the LUL Northern Line from Kennington to Battersea, for completion in 2020. 
 
In the private sector, Moorland & City Railways intend to reopen the 18 mile line between Stoke-on-Trent, Leek Brook Junction and Caldon Low (which they call Cauldon Lowe). Services between Leek Brook Junction and Caldon Low (operated as an adjunct to the Churnet Valley Railway) started in November 2010 (although the section beyond Ipstones is presently closed for relaying) and are seeking to resuscitate the line to Stoke-on-Trent.  The Llangollen Railway started operating passenger services to a provisional terminus at Corwen in October 2014, but the railway is to be extended further into the town.  The Strathspey Railway is extending to Grantown-on-Spey and since July 2014 has offered a limited summer service between its normal terminus at Broomhill and the river bridge at Dulnain. The first (very short) section of the Aln Valley Railway officially opened in October 2013, from a new station on the edge of Alnwick.  The line is to be extended to the National Rail station at Alnmouth, with a projected completion date of 2020.  The first section of the re-opened Lynton & Barnstaple Railway, a narrow gauge line, is in operation between Woody Bay and Killington Lane; extensions to Lynton and to Blackmoor Gate are planned as the next phase of reconstruction.  The Gloucester Warwickshire Railway is extending its line northwards to Broadway - trains currently run as far as Laverton and are planned to extend to Broadway from Easter 2018.  Most ambitiously, the two Great Central Railways at Loughborough are to be linked by means of a reinstated bridge over the Midland Main Line. Other heritage schemes in progress include Milton of Crathes to Banchory, Robertsbridge to Junction Road (Bodiam) and Dereham to County School.
 
====Temporary Closures:====
 
Work to upgrade the UK rail network is increasingly leading to lines being closed for extended periods.  Severe weather and the age of much railway infrastructure has resulted in more temporary closures caused by landslips and other problems with earthworks.  Current and planned temporary closures of four weeks or more are:
 
London Bridge (Metropolitan Junction) - Blackfriars: No passenger service December 2014 until 2018 to allow major upgrading of the Thameslink route through London.  Trains are diverted via Crystal Palace and Herne Hill. 
 
Gospel Oak - South Tottenham: Closed 24 September 2016 until 26 February 2017 for electrification
 
South Tottenham - Woodgrange Park: Closed 4 June 2016 until 26 February 2017 for electrification
 
Lea Bridge (Tottenham South Junction) - South Tottenham - Seven Sisters: Closed 14 May 2016 in connection with electrification works at South Tottenham; the once weekly train (0530 SO Liverpool Street - Enfield Town) is advertised to be restored from 18 February 2017 but subject to diversion via an alternative route on '' most'' Saturdays until April
 
Carlisle (Petteril Bridge Junction) - Newbiggin (freight)/Appleby (passenger): Closed on 10 February 2016 following a serious land slip and expected to re-open on 31 March 2017.
 
Birkenhead North and Birkenhead Central - Liverpool Lime Street (deep level) - James Street (Mann Island Junction) [http://www.merseyrail.org/wirral-track-renewal/what-is-wirral-loop-line-track-renewal.aspx (so-called Wirral loop line)]: Closed 3 January to 18 June 2017 for track renewal.  However, Birkenhead (both lines) to James Street will be open between 13 February and 29 May.
 
==Special Notes==
Trains, other than<i> Eurostar</i>, are not identified in timetables and on departure sheets by numbers. Services are publicly identified by their journey and departure time, but with variations to allow for intermediate stops. There is no standard convention, but as an example a train would be described as the 09:00 London King's Cross to Edinburgh, though at an intermediate stop would probably be announced as the &quot;10:32 Doncaster to Edinburgh, the 09:00 from King's Cross&quot;. An alpha-numeric system is used for operating purposes and these train reporting numbers can be found at [http://www.realtimetrains.co.uk/search/advanced Realtime Trains] and [http://www.opentraintimes.com/ OpenTrainTimes] or through [http://jplanner.travelinenortheast.info traveline] (remember to uncheck all Mode of Transport boxes except &quot;Train&quot; and ensure end points are &quot;Railway Station&quot;); in the results see the column labelled "Service&quot;. Some operators have their own four-digit train numbering systems for reservation purposes which is displayed on train sides and reservation tickets.


Departure sheets listing trains from a station in chronological order are rarely used. The usual format is to list destinations in alphabetic order, and provide details of all trains to each. Most stations have electronic displays, which indicate all departures (and often arrivals) within the next hour or so.
Selective door opening is increasingly used, particularly in London and South East England.  Trains are longer than some station platforms and only doors within the platform are unlocked. Announcements and visual displays advise passengers which carriages they need to be in if wishing to alight. This also happens to a limited extent on the London Underground, but usually only affecting the rearmost pair of doors.  


It is unusual for information displays and announcements at stations and on trains to be in any language other than English (and Welsh in Wales), though station name signs in Scotland appear in Gaelic as well as English.  Multi-lingual information is normally restricted to dedicated airport services and those using the Channel Tunnel.
The only long-distance overnight trains in Great Britain are:


No stations sell international tickets or can make international reservations, though there are facilities to make through bookings from certain stations by Eurostar.  International tickets and reservations are available at the We Know London Tourist Services desk in the shopping mall at St Pancras International station. Even the range of tickets available from Eurostar UK is very limited. For guidance on booking travel to and from Europe visit [http://www.seat61.com/Europe.htm#How%20do%20I%20book? The Man in Seat Sixty-One]'s website or see advice from [http://www.nationalrail.co.uk/stations_destinations/44929.aspx National Rail].
* [https://www.sleeper.scot/ Caledonian Sleeper] from London to Edinburgh, Glasgow, Aberdeen, Fort William and Inverness
* Great Western's [https://www.gwr.com/travelling-with-us/night-riviera-sleeper Night Riviera] from London to Penzance


Some carriages remain in service where it is necessary to open a window and use an outside handle to open an external door from inside but (apart from heritage operations) all doors are now centrally locked when trains are underway. Selective door opening is increasingly used, particularly in London and South East England.  Trains are longer than some station platforms and only doors within the platform are unlocked.  Announcements and visual displays advise passengers which carriages they need to be in if wishing to alight.   
Sleeping cars are provided, but not couchettes, and seating may be in saloons with non-reclinable seats, where passengers have no control of the lighting.   


Facing pairs of seats in trains have traditionally had the same number, being distinguished by being either &quot;facing&quot; or &quot;back&quot; relative to the direction of travel. They are distinguished on seat reservation labels and tickets by suffixes F and B. This can cause some confusion with seat reservations on trains that reverse en route. The practice is being replaced by most operators by numbering each seat uniquely, particularly on new trains.
Taking bicycles, other than folding ones, by train can be difficult. Space may be limited and some operators require advance reservations for bicycles. More information can be found at [http://www.nationalrail.co.uk/stations_destinations/cyclists.aspx National Rail].


There are very few long-distance overnight trains in Great Britain (and none in Northern Ireland). Couchettes are not provided and seating, when available, is in saloons with non-reclinable seats, where passengers may have no control of the lightingCompletely new trains are to be introduced on Anglo-Scottish overnight services by 2018, with four categories of accommodation.
Train services at weekends, and especially Saturday evening and Sunday until mid-afternoon, can be extensively altered because of [http://www.nationalrail.co.uk/service_disruptions/currentAndFuture.aspx engineering work]. With the paucity of alternative routes and a growing aversion to temporary single line working, buses frequently substitute for trains in such circumstances. There are an increasing number of initiatives to give extended overnight possessions Mondays to Thursdays, in order to reduce the extent of weekend closuresThis results in late evening trains being replaced by buses. Trials are being undertaken of mid-week line closures.  Blockades of a week or more are increasingly common.


Taking bicycles, other than folding ones, by train can be difficultSpace may be limited and some operators require advance reservations for bicyclesMore information can be found in the National Rail [http://www.nationalrail.co.uk/css/CycleLeaflet2015.pdf Cycling by Train] leaflet.
No trains run in the UK on Christmas Day and very few on Boxing Day, mostly on local services in the London and Glasgow areasNo domestic services run in Scotland on New Year's Day, but there are normally trains between England, Edinburgh and Glasgow.   


Train services at weekends, and especially Saturday evening and Sunday until mid-afternoon, can be extensively altered because of [http://www.nationalrail.co.uk/service_disruptions/currentAndFuture.aspx engineering work]. With the paucity of alternative routes and a growing aversion to temporary single line working, buses frequently substitute for trains in such circumstances.  There are an increasing number of initiatives to give extended overnight possessions Mondays to Thursdays, in order to reduce the extent of weekend closures.  This results in late evening trains being replaced by buses.
Very few stations have left luggage facilities. Unattended luggage may be removed by the police and processes to check that it is safe can be very destructive.


The risk of terrorism in Great Britain should not be over-stated - but this is due in part to stringent precautions, so very few stations have left luggage facilities. Unattended luggage may be removed by the police and processes to check that it is safe can be very destructive.
Railway enthusiasts are welcomed on stations - for guidance when on and about stations refer to [https://www.networkrail.co.uk/communities/railway-enthusiasts/railway-enthusiasts-and-photography-at-stations/ Network Rail's] advice.


Railway enthusiasts are welcomed on stations - for guidance when on and about stations refer to [http://www.networkrail.co.uk/aspx/777.aspx?cd=1 Network Rail's] advice.
==See also==
{{Navbox United Kingdom}}
[[Category:General Information]]

Latest revision as of 07:32, 28 March 2024

Country Name

United Kingdom of Great Britain and Northern Ireland

Nomenclature: "Great Britain" comprises the countries of England, Wales, and Scotland. "United Kingdom" (in full: The United Kingdom of Great Britain and Northern Ireland) comprises Great Britain and the Province of Northern Ireland. "British Isles" is a purely geographical description for the British mainland and the island of Ireland; the latter contains the Province of Northern Ireland and the Republic of Ireland. The Isle of Man and the Channel Islands are usually regarded as part of the British Isles, although independent of the UK government. All but the Republic of Ireland (which is entirely independent of the UK) are under the British Crown (monarchy).

National Railway System

Most infrastructure in Great Britain is owned by Network Rail, a company controlled by the government's Department for Transport (DfT). Most passenger train services are provided by operators under contracts with DfT, Transport for London, Merseytravel, Transport Scotland or the Welsh Government. Some operators are subsidiaries of major bus companies or national railways from other countries, for example Trenitalia. A UK Government subsidiary, DfT OLR Holdings Limited, operates services if the contractor is no longer able to do so, has had the contract terminated because of default or there has been no acceptable tender for provision of the service. Scottish Rail Holdings Limited is the equivalent in Scotland. Full details of passenger train operators are given by links from the Rail Delivery Group website. Maps showing where the operators ply are at Barry Doe's and Project Mapping websites. Passenger train operations collectively are known as 'National Rail'.

A new organisation, Great British Railways is being established to take strategic control of railways, in England at least, as well as taking over most of Network Rail's functions as infrastructure owner and operator throughout Britain.

Railways in Northern Ireland are owned by Northern Ireland Transport Holding Company (which remains state-owned) and are operated as the N I Railways (NIR) division of Translink.

Most operators in Great Britain had a franchise agreement, under which they took most of the commercial risk. DfT was considering changes to franchising when the Covid-19 pandemic made the system uneconomic, due to greatly reduced fares income to the operators. Franchises were replaced by Emergency Recovery Management Agreements and subsequently by National Rail Contracts under which the Government meets operating costs and receives fares and other income. The operating company is paid a management fee. Transport for Wales, ScotRail, Caledonian Sleeper, LNER, Northern and Southeastern are all being operated by public sector companies.

The operator of each train is indicated in the electronic National Rail Timetable and its printed derivatives by means of two-letter codes; for a de-coder and a chronology of privatisation and transfer/re-branding of Great Britain's passenger railway franchises to date go to the Rail Chronology website. Basic customer information about and links to the websites of each TOC are available through the National Rail website. Some further information about passenger train operators and past franchisees can be found in the DfT and Wikipedia websites. The Wikipedia list is usually more up to date and accurate than the DfT schedule!

A small number of operators provide passenger services on the national network which are not under contract to the DfT. These include Eurostar which is a unitary undertaking (Eurostar International Ltd) managed by SNCF, which has a 55% interest in the company. Private investors acquired the UK government's 40% stake in 2015 and SNCB/NMBS owns the remaining 5%. 'Open Access' passenger operators are:

Grand Union Trains intends to start services between London Paddington and Carmarthen and between London Euston and Stirling in 2025.

In addition

  • Eurotunnel operates a shuttle service for motor vehicles through the Channel Tunnel; this does not carry foot-passengers (although cyclists can be carried by arrangement)
  • North Yorkshire Moors Railway operates timetabled steam trains through between Pickering/Goathland, Grosmont and Whitby during the summer.
  • West Coast Railways operates timetabled steam trains between Fort William and Mallaig during the summer, but in practice these get fully booked well in advance. Services at the start of the 2024 season have been CANCELLED, because the operator no longer has authorisation to operate heritage carriages that lack central door locking.

Swanage Railway and West Coast Railways operated a service between Swanage and Wareham during the summer in 2017 and 2023. In 2018 and 2019 there was just a limited Saturday service by the local franchisee, South Western Railway. Swanage Railway does not plan further such services, on economic grounds.

All freight trains in Great Britain are operated by competing companies under "open access" conditions. The principal companies are:

  • DB Cargo UK (formerly English Welsh and Scottish Railway, now a subsidiary of Deutsche Bahn of Germany)
  • Freightliner (owned by US railroad Genesee & Wyoming Inc)
  • Colas Rail (part of the Bouygues group);
  • Direct Rail Services (owned by the Nuclear Decommissioning Authority)
  • GB Railfreight (owned by Infracapital, an infrastructure equity investor).

DB Cargo UK, in particular, and GB Railfreight, to a lesser extent, operate charter passenger trains. GB Railfreight also operates the Caledonian Sleeper trains on behalf of Caledonian Sleeper Limited.

Rail Operations Group concentrates on rolling stock moves for manufacturers, leasing companies and passenger operators, but started a parcels-carrying business, trading as Orion in 2021.

There are no longer any revenue freight trains in Northern Ireland.

Neither the Isle of Man nor the Channel Isles (îles Anglo-Normands) is legally part of the UK but the Isle of Man's active railways and tramways are to be found at the UK and Irish Heritage Railways website and under Trams/LRT-Systems respectively.

Official Website

Language

English. In addition Welsh is spoken in most parts of Wales, and Gaelic is used to a certain extent in north-west Scotland.

Currency

Pound sterling. Banks in Scotland and Northern Ireland issue their own notes, which are valid throughout the UK and usually accepted without question. Channel Islands and Manx notes (but not coins) are technically legal tender in the UK, but are best changed at banks.

UIC code

  • United Kingdom: numeric 70; alpha GB
  • Eurotunnel: numeric 69 (used only for accounting purposes and not shown on rolling stock).

Historically, the only British rolling stock to show UIC numbers were wagons passed to work on the now defunct train ferries from Harwich and Dover or through the Channel Tunnel. The Eurostar class 374 trains, which entered service in 2015, were the first UK-registered passenger stock to have UIC numbers, otherwise known as the European Vehicle Number (EVN). Rail Industry Standard RIS-2453-RST Vehicle Registration, Marking and Numbering, introduced in December 2017, requires new vehicles in Great Britain to be identified by EVN. On passenger vehicles only an abbreviated version is normally show. UIC numbering is not used by NI Railways.

Timetable

Great Britain (England, Wales, Scotland)

The official National Rail timetable is published on Network Rail's website (see below), twice yearly (in mid December and mid May). Services on Mondays to Fridays, on Saturdays (or Mondays to Saturdays) and on Sundays are usually different and laid out separately in the timetable; there may be several alternative Sunday services, to allow for engineering work, during the currency of a timetable. Barry Doe provides a comprehensive guide to printed and on-line public transport timetables.

Journey Planner

National Rail Enquiries Journey Planner

The Realtime Trains and OpenTrainTimes websites provide a quick-reference way of checking the latest schedule (or amendment) for any particular train

Downloadable Timetable

PDFs of the National Railway Timetable are available from the Network Rail website. These are maintained for Network Rail by Fabdigital and the version on their website may be more up to date.

Working (Staff) Timetables

Network Rail Working Timetables

You can also check for the latest variations to working timetable details for specific trains on the Realtime Trains and OpenTrainTimes websites.

London Underground working timetables. DLR is not included.

Printed Timetable

Since May 2020 there has been no comprehensive printed timetable for Great Britain and there are no printed timetable leaflets for most lines.

Engineering Information

National Rail's future engineering works

Northern Ireland

Journey Planner

On the Translink home page.

Downloadable Timetables

Translink bus and rail timetables

Printed Timetable

A series of four free leaflets is available.

Engineering Information

NIRailways Travel Updates

Maps

Printed Maps

  • The Rail Atlas Great Britain & Ireland gives detailed and accurate coverage of the UK railway system, and is widely available. It is mostly at 1:350,000, but with enlargements of many urban areas; an updated edition is published every 2-3 years.
  • TrackMaps publish a series of track diagrams (formerly Quail Track Diagrams) in five regional volumes.
  • Northern Ireland Railways are in a volume covering the whole of Ireland also published by TrackMaps
  • Historic atlases have been published by various other publishers.

Web-based Maps

Ticketing

There is no distance-related fare tariff in the UK, and fares are charged on a market basis. Certain fares are regulated and the amount by which train companies can increase some fares is specified by the Department for Transport.

Standard walk-on fares are high, but a wide range of discounted fares is available. These are subject to restrictions as to days and times when they can be used. It can be difficult to obtain accurate information as to fares and their availability, even from official enquiry offices, because the pricing structure is complicated and the different train companies are all making their own special offers. The most heavily discounted fares usually oblige the passenger to travel on specified trains (with no opportunity to alter these) - and only a limited number of tickets may be issued for each service. Train operators are increasingly introducing special offers that can only be taken up through their website. Higher fares are charged for use of domestic trains on HS1, the high-speed line to Kent, except for through tickets between Kent and destinations beyond London.

Tickets for any rail journey in the UK can be purchased from most train operators' websites, but the best price may be available from the operator whose service is being used. It is often possible to obtain a lower price for a journey by splitting it and buying a different ticket for each section. In such cases it is necessary to travel on a train that stops at stations where the validity of one ticket ends and another starts. This requirement does not apply if at least one of the tickets is a season ticket, rail rover or similar. It may also be found that a ticket to a station beyond one's destination is cheaper, but conditions need to be checked carefully. A break of journey may not be permitted, requiring an excess fare to be paid if exiting at an intermediate station. Various websites act as 'consolidators' and will compare what is available in order to offer the best deal, including split ticketing options.

Various Railcards are available, usually giving a fare reduction of one third. These are available nationally to groups, such as young people, families, senior citizens, two people travelling together, those with a disability and military personnel. Some cards are available to all, but only valid for travel within a particular geographic area. The cost of a Railcard may be recouped immediately if a long-distance journey is planned or if purchasing a high-price ticket such as a national rail rover. Some Railcards only give a discount for off-peak travel. Details of Railcards are available at National Rail. Details can be found at the unofficial Rail Rover website.

Overseas visitors should endeavour to purchase a rover ticket, such as a BritRail or InterRail pass, before travelling to the UK. Various rail rovers are available within the UK, but they do not offer the value or wide validity of those available to foreign visitors, and many are not valid until after the morning peak period.

In various areas where all stations have automatic ticket machines, including on the London Underground and most other tram and metro networks, a penalty fares system applies. Passengers found without a ticket are likely to have to pay a fine on the spot.

First class seating tends now to be found only on principal routes; in Northern Ireland it is limited to principal trains on the international route between Belfast and Dublin (where NIRailways call it "First plus" while partner Iarnród Éireann call it "Premium"). Eurostar maintain three classes: Standard, Standard Premier and Business Premier. On some trains, including many of those operated by Gatwick Express, Great Northern and Southern, there is no difference between first class and standard class seating. If a train including first class seats is used on a service advertised as standard class only, holders of standard class tickets may use the first class seats.

Infrastructure

Infrastructure Authority

  • Great Britain: Network Rail
  • Northern Ireland: Northern Ireland Railways Company Limited, through a subsidiary NIR Networks Limited

Network Statement

Network Rail. The Sectional Appendices are available here (scroll down to list of PDFs).

Translink

Gauge

  • Great Britain: Standard
  • Northern Ireland: 1600 mm [5 feet 3 inches]

Electrification

  • Great Britain: Mostly 25 kV 50 Hz. 750 V dc third rail is used on some lines in south east England and around Liverpool. The third rail network in south east England is by a considerable margin the most extensive such system in the world and the only place when conductor rail trains operate at up to 100 mph (160 km/hr). The line between Pelaw and Sunderland is electrified at 1500V dc overhead, to allow use by Tyne & Wear Metro. The line between Tinsley North Junction and Rotherham Parkgate is electrified at 750V dc overhead, for use by Sheffield Supertram. Most tramway systems are 750 V dc with Blackpool being 600 V dc.
  • Northern Ireland: no electrified lines.

Rule of the road

Left.

Distances

Other railways

  • Core Valley Lines (Cardiff to Rhymney, Coryton, Merthyr Tydfil, Aberdare and Treherbert): Owned by the Welsh Government and managed by a lessee, Amey Keolis Infrastructure/Seilwaith Amey Keolis Limited.
  • Crossrail Central Operating Section is the railway under Central London from Portobello Junction (Royal Oak) to Pudding Mill Lane Junction (Bow) and Abbey Wood. It is managed by Rail for London (Infrastructure) Limited, whose ultimate owner is Transport for London.
  • East London Line: Owned by Rail for London Limited, whose ultimate owner is Transport for London.
  • Eurotunnel: A partnership between the Channel Tunnel Group Limited and France-Manche S.A. that operates the Channel Tunnel under a long-term concession from the UK and French governments.
  • Heathrow Airport Holdings Limited owns the railway between London Heathrow Airport and the junction with the Great Western Main Line near Hayes & Harlington.
  • HS1 Ltd: The investor with a 30 years concession from the UK government to operate the high-speed line between London and the Channel Tunnel, though most aspects of day-to-day operation and maintenance are contracted out to Network Rail.

Facilities exist for special through running between the national system and some tourist lines.

Tourist lines

A map of UK heritage railways can be found at the "Heritage Rail - UK & Ireland" link on the Heritage Railway Association website.

Metro

London, Newcastle, Glasgow. Although part of the national railway system, the Merseyrail Electrics network in Liverpool is like a Metro. There are two separate networks in London. The Underground system is 630V dc third and fourth rail; the Docklands Light Railway is a fully-automated 750V dc third rail system. London Overground operates under a contract let by the Mayor of London and uses Transport for London branding, but operates almost entirely on Network Rail lines. The Glasgow and Merseyrail systems are third rail and Newcastle is 1500 V dc overhead. Glasgow Subway is 4 feet (1,219mm) gauge and was originally cable-worked. There are several lines where London Underground and main line trains share the same tracks. The Tyne & Wear Metro (Newcastle) operates to Sunderland over the Network Rail line from Pelaw.

The Core Valley Lines from Cardiff are being converted to a form of metro system.

Trams/LRT-Systems

Birmingham/Wolverhampton (Midland Metro), Blackpool, Croydon, Edinburgh, Llandudno (cable worked), Manchester, Nottingham, Seaton (Devon) and Sheffield. The Croydon, Manchester, Midland Metro, Nottingham and Seaton systems include extensive running over routes that were previously part of the national railway system. The Manchester and Nottingham systems have been considerably extended in recent years. On the Manchester Metrolink system a second route through Manchester city centre came into use on 26 February 2017, and the 5.5 km Trafford Park line opened on 22 March 2020. The Midland Metro in Birmingham was extended to Edgbaston on 17 July 2022 and to Wolverhampton Station on 17 September 2023. The first stage of a line to Brierley Hill is expected to open, to Dudley, in 2024. The extension of the Edinburgh line to Leith and Newhaven opened on 21 June 2023 and plans have been announced for further lines in the city. The Blackpool system Talbot Gateway extension, to Blackpool North station, is expected to be fully open in 2023. A metro system is proposed in Glasgow, but this project is at a very early stage.

The Seaton and Llandudno lines are essentially tourist operations, and both are narrow gauge. There are other tourist lines of a mile or more at the National Tramway Museum (Crich, near Matlock) and at Beamish Open Air Museum (near Gateshead), plus several other shorter lines.

The Isle of Man has three narrow gauge tramways, which operate on a seasonal basis: Douglas Bay Horse Tramway - along the promenade in Douglas; the Manx Electric Railway - an inter-urban line between Douglas, Laxey and Ramsey; and the Snaefell Mountain Railway - from Laxey to Snaefell Summit. After a period of uncertainty, the threat that the horse tramway line in Douglas might be shortened seems to have been seen off by a vote in Tynwald (the Manx parliament) in January 2017.

The Tinsley Chord, which connects the Sheffield tram system to a freight line near Meadowhall, allows tram-trains to run between Sheffield city centre and Rotherham Parkgate over Network Rail lines. Public services commenced on Thursday 25 October 2018. Sheffield tram-trains are dual voltage vehicles that can run on the 750 V Overhead Lines (OHLE) of the tram network and the 25 kV OHLE of the national rail network; however the line to Rotherham Parkgate is initially energised at 750 V because there is no 25 kV electrification in the area.

Track plans for most of the significant tram systems in the United Kingdom are available on the Railway Codes site and also on the Gleisplanweb site.

Recent and Future Changes

Some aspects of national railway operations are privatised, but infrastructure ownership has reverted to the public sector. There continues to be debate about the fragmented, expensive and complex nature of the system that has emerged, under the general oversight of the Department for Transport.

Route Closures and Service Reductions

Having undergone extensive cut backs in the 1960s, the present passenger network seems relatively secure. The closure of a passenger railway in the UK normally involves a lengthy legal process, and short-notice closures usually occur only if there is a sudden and dramatic infrastructure failure, or if the closure is deemed a "minor closure". However, a number of stations have closed and all passenger services over some lines have been withdrawn without the statutory procedure having been followed. Passenger services via the Channel Tunnel, or in connection with them, do not enjoy statutory protection from closure.

Some routes have been reduced to just one or two trains per day (or, in some cases, per week) in order to reduce operating costs without having to go through the closure procedure. These are included in the list of sparse services.

A newly-introduced passenger service can be designated as "experimental" for a period up to five years, during which time it may be withdrawn without the usual closure procedure needing to be followed. The only "experimental" service at present is Thanet Parkway station, until 30 July 2028.

Passenger services to be withdrawn

  • The railway between Nottingham and Worksop may be diverted at Whitwell to allow expansion of a dolomite quarry. This will eliminate Whitwell Tunnel. No date is set for this, but planning permission to expand the quarry was granted in 2018.
  • Planned diversion of trains between Belfast and Dublin to a new terminal facility - the Belfast Hub - being constructed close to Belfast Great Victoria Street may see the end of regular passenger services between Central Junction (Adelaide) and City Junction (City Hospital).

Closures and significant service reductions in recent years are

Passenger service withdrawn, line still open for other than regular passenger traffic:

  • Greenford LUL Bay Junction - Northolt Junction: The Wednesdays only train from West Ealing to West Ruislip ran for the last time on 7 December 2022.
  • Cowlairs East Junction - Cowlairs North Junction (Glasgow): The summer Sunday trains between Edinburgh and Oban have started and terminated at Glasgow Queen Street since 2023. Last use of the curve by the ScotRail service was on 28 August 2022. It continues to be used by the Royal Scotsman Western Scenic Wonders tour.
  • Barking Station Junction - Barking platform 1: No regular passenger traffic from 18 July 2022, when the line to Barking Riverside opened, but occasional diversions may be possible.
  • Dalmeny - Winchburgh Junction: Service withdrawn 23 March 2020, but without the statutory closure procedure having been followed.

Significant service reduction

  • Glenrothes with Thornton - Thornton South Junction: The frequent service via Dunfermline and Kirkcaldy became Sundays only, except for one train each way Mondays to Fridays, with effect from 15 May 2022.

Temporary Closures:

Work to upgrade the UK rail network is increasingly leading to lines being closed for extended periods. Severe weather and the age of much railway infrastructure has resulted in more temporary closures caused by landslips and other problems with earthworks. Current and planned temporary closures of four weeks or more, in approximate order of expected re-opening, are:

  • Shipley (Dockfield Junction) to Guiseley (Esholt Junction): From 8 February 2024 until 24 April 2024 or later, because of a major land slip.
  • Chinley (New Mills South Junction) to New Mills Central: from 26 March 2024 until 6 May 2024 or later, because of a bank slip west of New Mills Central (single line working is in operation past the slip, but the reduced track capacity requires the closure of the line east of New Mills Central).
  • Ayr to Stranraer and Kilmarnock to Barassie: From 25 September 2023 until 2 June 2024 or later, because of a dangerous building at Ayr.
  • Blackheath to Charlton: 1 June to 10 August 2024, for repairs to Blackheath Tunnel.
  • Ashford East Junction, connection to HS1: Eurostar ceased calling at Ashford on 19 March 2020 and will not resume before 2025/6.

Re-openings and Openings

Most projects involve upgrading existing routes, but some openings have occurred or are about to do so.

New and reinstated passenger services in recent years:

New passenger services are:

  • Kirkcaldy (Thornton North Junction) - Leven (scheduled to open on 2 June 2024)
  • West Midlands Metro Extension: The Royal - Wolverhampton Station (17 September 2023).
  • Westbourne Park Junction - Paddington and Stepney Green Junction - Pudding Mill Lane Junction (full opening of Elizabeth line) (6 November 2022)
  • Barking - Barking Riverside (18 July 2022)
  • West Midlands Metro Extension: Library - Edgbaston Village (17 July 2022)
  • Paddington - Abbey Wood (Elizabeth line) (24 May 2022)
  • Newport (Gaer Junction) - Pye Corner (Park Junction) (on introduction of trains between Newport and Crosskeys, 12 December 2021)
  • Crediton - Okehampton (20 November 2021; there was previously a service on summer Sundays)
  • Kennington - Battersea Power Station (London Underground, Northern Line extension, opened September 2021)

A daily service, generally hourly, was introduced between Liverpool Lime Street and Chester via Runcorn and Frodsham on 19 May 2019. Previously the curve between Halton Junction and Frodsham Junction had been used by a single unadvertised train in one direction only on summer Saturdays.

On tourist / heritage railways:

  • Llangollen Railway extended passenger services from Carrog to a provisional terminus at Corwen in October 2014 and to the permanent terminus in June 2023.
  • the Mid-Norfolk Railway ran inaugural passenger trains to Worthing level crossing (North Elmham) on 19 and 20 May 2018, but regular services continue to terminate at Dereham. The railway aspires to continue to County School.
  • The first (very short) section of the Aln Valley Railway officially opened in October 2013, from a new station on the edge of Alnwick, with a longer run available from December 2017. It is planned that the railway will reach the National Rail station at Alnmouth.
  • The first section of the re-opened Lynton & Barnstaple Railway, a narrow gauge line, is in operation between Woody Bay and Killington Lane. Extensions towards Lynton and to Blackmoor Gate are planned as the next phase of reconstruction.

Projects authorised or under construction are:

Work is under way to re-open the railway between Kirkcaldy (Thornton North Junction) and Levenmouth for passenger services on 2 June 2024. Initially, all trains will run via Kirkcaldy, but it is expected that some trains will later run via Cowdenbeath, providing many more via the curve from Thornton West Junction than the current sparse service.

A Transport & Works Act Order for the introduction of passenger trains over the freight line to Ashington was granted in June 2022 and the line is due to open by December 2024. The UK Government has announced plans to re-open the railway to Fleetwood, but this may become a tramway. The UK Government is also funding feasibility studies into re-opening a number of other lines, but these are at a very early stage.

Work has started on construction of a high speed railway (HS2) from London to Birmingham, but the line will not be opened until 2026 at the earliest. A flythrough of the route is here. There will be a link to the West Coast Main Line at Handsacre, near Lichfield. Plans to extend the line to Manchester and beyond have been cancelled by the UK Government.

Plans were being developed for a second Crossrail line, linking south west and north east London. All work on this stopped in autumn 2020, as a result of economies made to deal with the Covid pandemic. It is questionable whether the scheme will be revived, if there is the expected permanent reduction in commuter traffic.

Work is under way to re-open the derelict line between Calvert and Bletchley. A Transport & Works Act Order for this scheme was granted in February 2020 and services between Oxford and Milton Keynes are scheduled to start in December 2024. The longer-term objective is to re-introduce trains between Oxford and Cambridge.

Heathrow Southern Railway intends to build a new railway south-west from Heathrow Airport to link with the Staines to Windsor line, together with a branch to Virginia Water or Chertsey.

In the private sector:

  • The Leadhills & Wanlockhead Railway is constructing an extension from Glengonnar to Wanlockhead.
  • Moorland & City Railways have a stated intention to reopen the line between Stoke-on-Trent and Leek Brook Junction, to a junction with the Churnet Valley Railway, but progress seems to be languishing.
  • Most ambitiously, the two Great Central Railways at Loughborough are being linked by means of a reinstated bridge over the Midland Main Line.
  • The Rother Valley Railway has obtained a Transport and Works Act Order to rebuild the railway between Robertsbridge and Junction Road (Bodiam).
  • The Royal Deeside Railway is extending its line to Crathes West Lodge.
  • Strathspey Railway is extending to Grantown-on-Spey and during summer 2014 and 2015 offered a limited service between its normal terminus at Broomhill and the river bridge at Dulnain. Further work depends on obtaining statutory powers under the Transport and Works Act and constructing a new bridge to carry the railway over the A95 main road.
  • The Helston Railway provides a short ride near Prospidnick, but plans to extend to Helston and eventually to Gwinear Road.

Electrification

Main line electrification in Great Britain came to a virtual standstill following railway privatisation, because private-sector train operators and rolling stock companies preferred the flexibility of diesel traction. The only schemes to proceed were between Crewe and Kidsgrove (near Stoke on Trent) (electrified for diversionary use), the reconstructed Larkhall branch line in Scotland and High Speed 1 (the Channel Tunnel rail link) [see below].

In 2009 Department for Transport policy shifted towards extending electrification, with significant schemes proposed and a few implemented. However, greatly increased costs have resulted in projects being curtailed and delayed. Poor cost estimating, increased safety standards, over-specification and loss of practical experience of electrification appear to be among the causes. In July 2017 the UK Government announced an end to plans for further railway electrification in England and Wales, with reliance instead on bi-mode diesel/electric trains. This will included converting some electric multiple-units to bi-mode working. There have also been experiments with battery operation. In contrast, the Scottish Government required Network Rail to develop an electrification technical specification that can deliver an "efficient and affordable rolling programme of electrification".

Electrification schemes recently completed in England and Wales are:

  • Bedford to Corby (May 2021)
  • London (Heathrow Airport Junction) to Cardiff, Chippenham (Christian Malford) and Newbury (Phased introduction of electric services between May 2017 and January 2020). The scheme was cut back to omit Swansea, Bath Spa, Bristol Temple Meads, Oxford and the Thames Valley branch lines.
  • Walsall to Rugeley Trent Valley (May 2019)
  • Manchester to Preston via Bolton (February 2019)
  • Gospel Oak to Woodgrange Park via South Tottenham (January 2019, but limited electric service initially, because of delayed delivery of rolling stock)

Schemes under way in England:

  • Kettering - Market Harborough
  • Manchester - Huddersfield - Leeds - York
  • Wigan North Western - Lostock Junction (near Bolton) (announced 1 September 2021, expected completion 2024/2025)

The UK Government has announced that electrification of the Midland Main Line is to be completed to Nottingham, Derby and Sheffield.

The Welsh Government is sponsoring electrification of the Valley Lines from Cardiff to Bargoed, Coryton, Merthyr Tydfil, Aberdare and Treherbert. Light rail vehicles are to be used from Cardiff to Coryton and on routes via Radyr. Tri-mode trains will be used from Rhymney to Penarth, Barry Island and the Vale of Glamorgan line, using battery power between Rhymney and Bargoed, and diesel south of Cardiff.

Following an extensive programme of electrification completed between 2012 and 2019, most lines in Central Scotland are electrified, with recent schemes comprising:

  • Holytown to Kirknewton (Midcalder Jn) via Shotts (Some electric services April 2019, full service May 2019)
  • Glasgow Central (Muirhouse Central Jn) to Barrhead (December 2023, but most trains continue to Kilmarnock or beyond, so remain diesel-worked)

The line from Falkirk to Grangemouth has also been electrified for freight traffic, but there are proposals to reinstate a passenger service.

Work has started on electrification to East Kilbride. The line from Haymarket (Edinburgh) to Dalmeny is being electrified as the first phase of a scheme to electrify routes through Fife. Transport Scotland's Rail Services Decarbonisation Action Plan, published in July 2020, envisages most lines in Scotland being electrified. Priorities are the Kilmarnock line; Edinburgh to Tweedbank; routes in Fife; and Dunblane to Aberdeen. Later extensions will take electrification to Girvan; Gretna via Dumfries; and Inverness to Perth, Aberdeen and Tain.

Older Changes

For details of changes more than five years ago see United_Kingdom - Older General Information.

Special Notes

Train numbers in Great Britain follow an alpha-numeric format, thus 1A22. The first digit indicates the type of train (passenger trains are 1, 2 or 9), in most cases the letter indicates its route or destination and the remaining digits identify the particular train. Different trains can and do use the same number, so long as they do not conflict geographically or operate several hours apart. Since December 2021 train numbers have been shown in the National Rail Timetable, but they are not normally used for passenger information purposes. It is more usual for trains to be referred to by their schedule, for example as the "10:00 London King's Cross to Aberdeen". International trains have four digit numbers where the second figure is 0 or 1, which can be treated as letters O and I in the UK.

Departure sheets listing trains from a station in chronological order are rarely used. The usual format is to list destinations in alphabetic order, and provide details of all trains to each, or to provide timetable posters. Most stations have electronic displays, which indicate all departures (and often arrivals) within the next hour or so.

It is unusual for information displays and announcements at stations and on trains to be in any language other than English (and Welsh in Wales), though most station name signs in Scotland appear in Gaelic as well as English. Multi-lingual information is normally restricted to dedicated airport services and those using the Channel Tunnel.

No stations sell international tickets or can make international reservations, though there are facilities to make through bookings from certain stations by Eurostar. Even the range of tickets available from Eurostar is very limited. For guidance on booking travel to and from Europe visit The Man in Seat Sixty-One's website or see advice from National Rail.

Selective door opening is increasingly used, particularly in London and South East England. Trains are longer than some station platforms and only doors within the platform are unlocked. Announcements and visual displays advise passengers which carriages they need to be in if wishing to alight. This also happens to a limited extent on the London Underground, but usually only affecting the rearmost pair of doors.

The only long-distance overnight trains in Great Britain are:

Sleeping cars are provided, but not couchettes, and seating may be in saloons with non-reclinable seats, where passengers have no control of the lighting.

Taking bicycles, other than folding ones, by train can be difficult. Space may be limited and some operators require advance reservations for bicycles. More information can be found at National Rail.

Train services at weekends, and especially Saturday evening and Sunday until mid-afternoon, can be extensively altered because of engineering work. With the paucity of alternative routes and a growing aversion to temporary single line working, buses frequently substitute for trains in such circumstances. There are an increasing number of initiatives to give extended overnight possessions Mondays to Thursdays, in order to reduce the extent of weekend closures. This results in late evening trains being replaced by buses. Trials are being undertaken of mid-week line closures. Blockades of a week or more are increasingly common.

No trains run in the UK on Christmas Day and very few on Boxing Day, mostly on local services in the London and Glasgow areas. No domestic services run in Scotland on New Year's Day, but there are normally trains between England, Edinburgh and Glasgow.

Very few stations have left luggage facilities. Unattended luggage may be removed by the police and processes to check that it is safe can be very destructive.

Railway enthusiasts are welcomed on stations - for guidance when on and about stations refer to Network Rail's advice.

See also