[D] This crossing links only to the Azerbaijani enclave of Nakhichevan. One daily freight train runs between Iran and the northern border of the enclave.
[D] This crossing links only to the Azerbaijani enclave of Nakhichevan. A daily freight train has run between Iran and the northern border of the enclave. However, there is some doubt as to whether any trains are running as the Iranian Foreign Minister talked at a meeting on 18 February 2021 about reopening the line.


==(Osmanli -) Astara ADDY - Astara IRIR (- Rasht - Qazvin)==
==(Osmanli -) Astara ADDY - Astara IRIR (- Rasht - Qazvin)==
[D] Freight only. This 10 km long dual gauge (1520/1435 mm) border crossing was officially commissioned on 25 December 2017 and opened to traffic on 29 March 2018. At present it is a dead end branch: construction of the Rasht - Astara IRIR line is expected to be completed in 2020. Astara ADDY will be equipped with bogie changing facilities and probably also an SUW 2000 gauge changer.
[D] Freight only. This 10 km long dual gauge (1520/1435 mm) border crossing was officially commissioned on 25 December 2017 and opened to traffic on 29 March 2018. At present it is a dead end branch: construction of the Rasht - Astara IRIR line is in progress as at February 2021. Astara ADDY will be equipped with bogie changing facilities and probably also an SUW 2000 gauge changer.


== See also ==
== See also ==

Revision as of 19:23, 26 February 2021

(Nakhichevan -) Julfa/Culfa ADDY - Jolfa IRIR (- Tabriz)

[D] This crossing links only to the Azerbaijani enclave of Nakhichevan. A daily freight train has run between Iran and the northern border of the enclave. However, there is some doubt as to whether any trains are running as the Iranian Foreign Minister talked at a meeting on 18 February 2021 about reopening the line.

(Osmanli -) Astara ADDY - Astara IRIR (- Rasht - Qazvin)

[D] Freight only. This 10 km long dual gauge (1520/1435 mm) border crossing was officially commissioned on 25 December 2017 and opened to traffic on 29 March 2018. At present it is a dead end branch: construction of the Rasht - Astara IRIR line is in progress as at February 2021. Astara ADDY will be equipped with bogie changing facilities and probably also an SUW 2000 gauge changer.