Border Crossings: Poland - Slovakia: Difference between revisions
(→(Muszyna -) Leluchów PKP - Čirč ŽSR (- Plaveč): 2018 prospects) |
|||
Line 1: | Line 1: | ||
==Łupków PKP - Medzilaborce mesto ŽSR== | ==Łupków PKP - Medzilaborce mesto ŽSR== | ||
[D] ŽSSK worked to Łupków when passenger services ceased on 29 August 2010, but | [D] ŽSSK worked to Łupków when passenger services ceased on 29 August 2010, but reopened SSuO 1 July 2017. In 2018-19 there are two summer only train pairs, one SSuO and the other SO. | ||
==(Muszyna -) Leluchów PKP - Čirč ŽSR (- Plaveč)== | ==(Muszyna -) Leluchów PKP - Čirč ŽSR (- Plaveč)== |
Revision as of 14:14, 10 December 2018
Łupków PKP - Medzilaborce mesto ŽSR
[D] ŽSSK worked to Łupków when passenger services ceased on 29 August 2010, but reopened SSuO 1 July 2017. In 2018-19 there are two summer only train pairs, one SSuO and the other SO.
(Muszyna -) Leluchów PKP - Čirč ŽSR (- Plaveč)
[E] PKP works to Plaveč. After serious flood damage washed away a bridge north of Muszyna on 4/5 June 2010 the line was completely closed until 17 January 2011, but only freight traffic resumed and the cross border passenger service was not re-introduced. However it is believed a Summer only Poprad/Kosice -Krynica/Krakow service may commence in 2018 but this is not yet officially confirmed.
(Nowy Targ -) Podczerwone PKP - Sucha Hora ŽSR (- Trstená)
Line closed and lifted. A bridge was blown up at the beginning of World War 2, thereby closing the border crossing. Czarny Dunajec - Podczerwone closed to all traffic in 1989 and Trstená - Sucha Hora in 1973.
Zwardoń PKP - Skalité-Serafínov ŽSR (- Čadca)
[E] ŽSSK works services to Zwardoń. Electrification was completed in December 2002. There are four local train pairs across the border [1 SSuX] from (Čadca) - Skalité-Serafínov to Zwardoń. Long distance trains via this route have ceased.