Border Crossings: Poland - Slovakia

From EGTRE
Jump to navigationJump to search

Łupków PKP - Medzilaborce mesto ŽSR

[D] ŽSSK worked to Łupków when passenger services ceased on 29 August 2010, but reopened SSuO 1 July 2017. In 2018-19 there are two summer only train pairs, one SSuO and the other SO.

(Muszyna -) Leluchów PKP - Čirč ŽSR (- Plaveč)

[E] PKP works to Plaveč. After serious flood damage washed away a bridge north of Muszyna on 4/5 June 2010 the line was completely closed until 17 January 2011, but only freight traffic resumed. There are no trains in the 2018-19 timetable.

(Nowy Targ -) Podczerwone PKP - Sucha Hora ŽSR (- Trstená)

Line closed and lifted. A bridge was blown up at the beginning of World War 2, thereby closing the border crossing. Czarny Dunajec - Podczerwone closed to all traffic in 1989 and Trstená - Sucha Hora in 1973.

Zwardoń PKP - Skalité-Serafínov ŽSR (- Čadca)

[E] ŽSSK works services to Zwardoń. Electrification was completed in December 2002. There are four local train pairs across the border in 2018-19. Long distance trains via this route have ceased.

See also