Border Crossings: Portugal - Spain: Difference between revisions

From EGTRE
Jump to navigationJump to search
(21 intermediate revisions by 3 users not shown)
Line 2: Line 2:


==(Porto -) Valença do Minho CP - Tui RENFE (- Vigo)==
==(Porto -) Valença do Minho CP - Tui RENFE (- Vigo)==
[D] Two regional passenger train pairs operate between Valença do Minho and Vigo operated in 2015 by RENFE. These are the only passenger trains that serve Tui. In addition, two ''Diurno'' express train pairs run limited stop between Porto and Vigo operated by CP.
[ED] The change of voltage is at Valença do Minho. The line on the Portuguese side is electrified at 25kV AC, being officially inaugurated on 29 April 2021. That on the Spanish side will be at 3kV.
 
Two ''Trencelta'' limited stop pairs run between Porto and Vigo, operated by CP, although they are susceptible to cancellation owing to rolling stock shortages. Additionally pre-covid there were two RENFE regional passenger trains between Valença do Minho and Vigo, [the only passenger trains that serve Tui and a rare curve in Spain] but as at August 2022 they remain suspended.


==(Porto - Pocinho -) Barca de Alva CP - Fregeneda RENFE (- Salamanca)==
==(Porto - Pocinho -) Barca de Alva CP - Fregeneda RENFE (- Salamanca)==
Line closed. In August 2009 the Portuguese Secretary of State for Transport announced that Pocinho to Barca de Alva was to be reopened for tourist traffic, especially to the Coa Valley Archaeological Park, a World Heritage Site. RENFE announced plans some years ago to reopen their section for cross border freight. However, both of these projects are victims of the present financial crisis.
[D] Line closed. RENFE worked to Barca de Alva until the service was withdrawn from 1 January 1985. CP services ceased in 1988. A plan to reopen Pocinho to Barca de Alva for tourist traffic, especially to the Coa Valley Archaeological Park, a World Heritage Site, came to nothing.


==(Pampilhosa -) Vilar Formoso CP - Fuentes de Oñoro RENFE (- Salamanca)==
==(Pampilhosa -) Vilar Formoso CP - Fuentes de Oñoro RENFE (- Salamanca)==
[ED] RENFE operates to Vilar Formoso.  
[ED] RENFE operates to Vilar Formoso. Electrification at 25 kV 50 Hz between Salamanca and Vilar Formoso is planned to be completed in 2022. <br />
The combined Sud Express and Lusitania Trenhotel to Lisboa was suspended on presumably 15 March 2020, when the national lockdown in Spain started, and have never been reinstated. This was the only passenger train on this line.


==(Entroncamento -) Marvāo Beirã CP - Valencia do Alcántara RENFE (- Cáceres)==
==(Entroncamento -) Marvāo Beirã CP - Valencia do Alcántara RENFE (- Cáceres)==
[D] Line closed. All through freight traffic was discontinued on 5 February 2012. The ''Lusitania'' (Lisboa - Madrid sleeping car train) was rerouted from 15 August 2012. CP worked to Valencia do Alcántara.
[D] Line closed. CP worked to Valencia do Alcántara. All through freight traffic was discontinued on 5 February 2012. The ''Lusitania'' (Lisboa - Madrid sleeping car train) was rerouted from 15 August 2012, thereby closing the line. Track survives westwards from Valencia station and RENFE staff consider that the line could still be used in an emergency. On the Portuguese side, however, REFER has deleted the line from their list of railways.


==(Entroncamento -) Elvas CP - Badajoz RENFE==
==(Entroncamento -) Elvas CP - Badajoz RENFE==
[D] CP works to Badajoz. The daily passenger service was withdrawn on 5 June 2004, reinstated on 13 December 2009 and closed again when the entire Torre das Vargens - Elvas - Badajoz RENFE line passenger service was withdrawn on 1 January 2012.
[D] CP works to Badajoz. The daily passenger service was withdrawn on 5 June 2004, reinstated on 13 December 2009 and closed again when the entire Torre das Vargens - Elvas - Badajoz passenger service was withdrawn on 1 January 2012. Entroncamento to Portalegre reopened on 25 September 2015 for what was described as a six month experimental service. In January 2016 a bill to reinstate trains to Badajoz was accepted unanimously by the Portuguese parliament and a service reintroduced on 29 August 2017.
 
A new line for freight between Évora and Elvas, for traffic from the port of Sines, is planned for completion in 2022.


== See also ==
== See also ==

Revision as of 17:20, 16 September 2022

All rail routes between this pair of countries are 1668mm gauge.

(Porto -) Valença do Minho CP - Tui RENFE (- Vigo)

[ED] The change of voltage is at Valença do Minho. The line on the Portuguese side is electrified at 25kV AC, being officially inaugurated on 29 April 2021. That on the Spanish side will be at 3kV.

Two Trencelta limited stop pairs run between Porto and Vigo, operated by CP, although they are susceptible to cancellation owing to rolling stock shortages. Additionally pre-covid there were two RENFE regional passenger trains between Valença do Minho and Vigo, [the only passenger trains that serve Tui and a rare curve in Spain] but as at August 2022 they remain suspended.

(Porto - Pocinho -) Barca de Alva CP - Fregeneda RENFE (- Salamanca)

[D] Line closed. RENFE worked to Barca de Alva until the service was withdrawn from 1 January 1985. CP services ceased in 1988. A plan to reopen Pocinho to Barca de Alva for tourist traffic, especially to the Coa Valley Archaeological Park, a World Heritage Site, came to nothing.

(Pampilhosa -) Vilar Formoso CP - Fuentes de Oñoro RENFE (- Salamanca)

[ED] RENFE operates to Vilar Formoso. Electrification at 25 kV 50 Hz between Salamanca and Vilar Formoso is planned to be completed in 2022.
The combined Sud Express and Lusitania Trenhotel to Lisboa was suspended on presumably 15 March 2020, when the national lockdown in Spain started, and have never been reinstated. This was the only passenger train on this line.

(Entroncamento -) Marvāo Beirã CP - Valencia do Alcántara RENFE (- Cáceres)

[D] Line closed. CP worked to Valencia do Alcántara. All through freight traffic was discontinued on 5 February 2012. The Lusitania (Lisboa - Madrid sleeping car train) was rerouted from 15 August 2012, thereby closing the line. Track survives westwards from Valencia station and RENFE staff consider that the line could still be used in an emergency. On the Portuguese side, however, REFER has deleted the line from their list of railways.

(Entroncamento -) Elvas CP - Badajoz RENFE

[D] CP works to Badajoz. The daily passenger service was withdrawn on 5 June 2004, reinstated on 13 December 2009 and closed again when the entire Torre das Vargens - Elvas - Badajoz passenger service was withdrawn on 1 January 2012. Entroncamento to Portalegre reopened on 25 September 2015 for what was described as a six month experimental service. In January 2016 a bill to reinstate trains to Badajoz was accepted unanimously by the Portuguese parliament and a service reintroduced on 29 August 2017.

A new line for freight between Évora and Elvas, for traffic from the port of Sines, is planned for completion in 2022.

See also