Border Crossings: Armenia - Georgia: Difference between revisions
From EGTRE
Jump to navigationJump to search
Geoff Blyth (talk | contribs) |
→(Vanadzor -) Ayrum YKŽD - Sadakhlo RK (- Tbilisi): Update for tarins 371/372 and 201/202 |
||
Line 2: | Line 2: | ||
==(Vanadzor -) Ayrum YKŽD - Sadakhlo RK (- Tbilisi)== | ==(Vanadzor -) Ayrum YKŽD - Sadakhlo RK (- Tbilisi)== | ||
[E] Services on this route are thought to have been discontinued in about 2011 but have been restored at an unknown date. | [E] Services on this route are thought to have been discontinued in about 2011 but have been restored at an unknown date. The timetable shows Yerevan - Tbilisi night service 371/372 is shown as restarting 2 October 2025 and running every other day until 13 June 2026. During the summer [14 June - 1 October 2025] the Yerevan - Batumi (Makhinjauri) train 201/202 is shown running every other day but no information for train 401/402. | ||
The Yerevan - Tbilisi line was severely damaged by floods in May 2024 and is unlikely to reopen for some time. | The Yerevan - Tbilisi line was severely damaged by floods in May 2024 and is unlikely to reopen for some time. |
Revision as of 18:55, 18 September 2025
All rail routes between this pair of countries are 1520mm gauge.
(Vanadzor -) Ayrum YKŽD - Sadakhlo RK (- Tbilisi)
[E] Services on this route are thought to have been discontinued in about 2011 but have been restored at an unknown date. The timetable shows Yerevan - Tbilisi night service 371/372 is shown as restarting 2 October 2025 and running every other day until 13 June 2026. During the summer [14 June - 1 October 2025] the Yerevan - Batumi (Makhinjauri) train 201/202 is shown running every other day but no information for train 401/402.
The Yerevan - Tbilisi line was severely damaged by floods in May 2024 and is unlikely to reopen for some time.