Border Crossings: Finland - Sweden: Difference between revisions

From EGTRE
Jump to navigationJump to search
 
(7 intermediate revisions by 3 users not shown)
Line 1: Line 1:
Note that there is a one hour time difference between Finland and Sweden.
==Tornio/Torneå VR - Haparanda TRV==
==Tornio/Torneå VR - Haparanda TRV==
[DE] Freight only. A single Swedish 1435mm gauge track extends to Tornio and a Finnish 1524mm gauge track to Haparanda. The two lines are interlaced across the border bridge. Broad gauge trains to Haparanda yard are mainly vans whose contents are transhipped to standard gauge vans. Although no official messages have been seen,all transshipment takes place in Haparanda since autumn 2012.  The certificate for the transshipment crane (70 tons gantry crane) in the Tornio yard is said to have expired at the end of 2012. Thus, there are no longer any Swedish freight trains in Tornio, the only standard gauge activity expected in Tornio(by one of the Swedish drivers) is the occasional transfer (very few times a year) of track machines (which are re-gauged). A Finnish diesel shunts in Haparanda normally once or twice every Mon-Fri.  The upgrading of Boden - Morjärv - Kalix and building of a new line Kalix - Haparanda and electrification of both is completed. The last train Morjärv - Karungi - Haparanda operated 8 December 2012. The old line is now isolated and the track will be removed when the wheather permits.
[E] Freight only 1524 mm gauge. A single 1435 mm gauge track previously extended to Tornio station but now ends 600m short of there. The two lines are interlaced across the border bridge. Electrification of the Laurila – Tornio – Haparanda line at 25 kV 50 Hz was completed on 27 January 2025. All transshipment has taken place at Haparanda since autumn 2012 because the crane at Tornio was no longer usable; the only standard gauge activity at Tornio was the occasional transfer of track machines, which were then re-gauged.
 
In recent years there has been talk of a possible two pair broad gauge train service across the border but in Autumn 2024 VR stated they can run only with financial support, which has not yet been provided. A study on extending the standard gauge to serve freight installations near Kemi, possibly later to Oulu, Kolari and Rovaniemi is under way to report by Summer 2025.


==Turku/Åbo VR - Stockholm Värtan TRV==
==Turku/Åbo VR - Stockholm Värtan TRV==
Line 6: Line 10:


== See also ==
== See also ==
* [[Finland]]
* [[Sweden]]
* [[Border Crossings - General Information]]
* [[Border Crossings - General Information]]



Latest revision as of 11:35, 26 March 2025

Note that there is a one hour time difference between Finland and Sweden.

Tornio/Torneå VR - Haparanda TRV

[E] Freight only 1524 mm gauge. A single 1435 mm gauge track previously extended to Tornio station but now ends 600m short of there. The two lines are interlaced across the border bridge. Electrification of the Laurila – Tornio – Haparanda line at 25 kV 50 Hz was completed on 27 January 2025. All transshipment has taken place at Haparanda since autumn 2012 because the crane at Tornio was no longer usable; the only standard gauge activity at Tornio was the occasional transfer of track machines, which were then re-gauged.

In recent years there has been talk of a possible two pair broad gauge train service across the border but in Autumn 2024 VR stated they can run only with financial support, which has not yet been provided. A study on extending the standard gauge to serve freight installations near Kemi, possibly later to Oulu, Kolari and Rovaniemi is under way to report by Summer 2025.

Turku/Åbo VR - Stockholm Värtan TRV

[D] Freight only. Train Ferry (Sea Wind Line). Opened 13 June 1989. Closed 31 December 2011. Equipment for bogie replacement in Turku.

See also