Lithuania - General Information: Difference between revisions

From EGTRE
Jump to navigationJump to search
Rail Baltica: To Vilnius back on?
Printed Maps: update to ERA Regional Series: Book 3
 
(One intermediate revision by one other user not shown)
Line 40: Line 40:
===Printed Maps===
===Printed Maps===
*[[Printed Maps#ERA-E | European Railway Atlas (All-Europe Edition)]] by M.G. Ball.
*[[Printed Maps#ERA-E | European Railway Atlas (All-Europe Edition)]] by M.G. Ball.
*[[Printed Maps#ERA-R-EE-LV-LT-BY-UA-MD | European Railway Atlas (Regional Series - Baltic States, Belarus and Ukraine)]] by M.G. Ball.
*[[Printed Maps#ERA-R-3 | European Railway Atlas (Regional Series: Book 3)]] by M.G. Ball.
*[[Printed Maps#ES-LT-LV-EE | Mapa Kolejowa Litwy, Łotwy i Estonii]] (Lithuania, Latvia and Estonia) by W. Kolondra.
*[[Printed Maps#ES-LT-LV-EE | Mapa Kolejowa Litwy, Łotwy i Estonii]] (Lithuania, Latvia and Estonia) by W. Kolondra.
*[[Printed Maps#QM-LV-LT | Railway Map of Latvia, Lithuania and Russia (Kaliningrad Region)]] by Quail Map Company.
*[[Printed Maps#QM-LV-LT | Railway Map of Latvia, Lithuania and Russia (Kaliningrad Region)]] by Quail Map Company.
Line 100: Line 100:
In August 2025, Rail Baltica signed a contract with DB Engineering & Consulting for [https://www.railtech.com/all/2025/08/11/gateway-to-the-west-rail-baltica-awards-db-design-contract-for-lithuania-poland-section/?utm_source=newsletter&utm_medium=email&utm_campaign=Newsletter%20week%202025-33 design and supervision] of a double track electrified line of 96km from the border with Poland to Jiesia in Kaunas.
In August 2025, Rail Baltica signed a contract with DB Engineering & Consulting for [https://www.railtech.com/all/2025/08/11/gateway-to-the-west-rail-baltica-awards-db-design-contract-for-lithuania-poland-section/?utm_source=newsletter&utm_medium=email&utm_campaign=Newsletter%20week%202025-33 design and supervision] of a double track electrified line of 96km from the border with Poland to Jiesia in Kaunas.


Significant progress is being made in Lithuania, but Estonia are suggesting their part may not be completed until 2035 and not the hoped for 2030, and to save costs the Estonian section may not be double track throughout.
Significant progress is being made in Lithuania, but Estonia are suggesting their part may not be completed until 2035 and not the hoped for 2030, and to save costs the Estonian section initially will not be double track.


===Recent Changes (latest developments at top)===
===Recent Changes (latest developments at top)===

Latest revision as of 21:09, 8 September 2025

Country Name

Lithuania (Lietuva)

National Railway System

The national railway AB Lietuvos Geležinkeliai is a state-owned holding company with stand-alone passenger, freight and infrastructure businesses. However, access to its website is at present blocked to users in some (non EU) countries.

The passenger business LG Keleiviams was formally registered on 28 February 2019 and has taken over the Passenger Transport Directorate (Keleivių Vežimo Direkcia) division of Lietuvos Geležinkeliai. However, access to its website is also blocked to users in some (non EU) countries.

National Railway Operator

LTG Link operates passenger services in Lithuania

Language

Lithuanian.

Currency

Euro

UIC code

numeric 24; alpha LT

Timetable

Journey Planner

LTG LINK

Downloadable Timetable

No downloadable timetables are available.

Printed Timetable

A printed timetable is produced, but appears to be for staff use only. Travel centres such as the one at Vilnius offer individual timetables on photocopied sheets.

Engineering Information

This information is no longer available.

Bus Information

autobusubilietai.lt provides a journey planner for buses in Lithuania and elsewhere in Europe.

Lux Express operates coach routes in the Baltic region.

Maps

Printed Maps

Web-based Maps

Ticketing

There are no known network tickets, but fares are cheap.

Tickets can be purchased on the LTG-Link website including for International travel to Riga and Tallinn. From 4 November 2024, a service fee of 2 EUR is levied when buying tickets on the train, except for pensioners, children and on Vilnius Airport - Vilnius local services.

Infrastructure

Infrastructure Authority

AB LTG Infra is responsible for the infrastructure. However, access to its website is blocked to users in some (non EU) countries.

Network Statement

The latest Network Statements are contained in the Network Statements section.

Gauge

"Russian" gauge (1520 mm) except for

  • "Rail Baltica": Trakiszki (Polish border) - Šeštokai - Kaunas - Palemonas (and eventually onwards to the Latvian Border via Panevėžys) (standard gauge; 1435 mm). Rail Baltica is mixed gauge between Mockava and Šeštokai, then parallel to the 1520 mm gauge line between Šeštokai and Palemonas, except for mixed gauge through the tunnel east of Kaunas. The Kaunas avoider appears to have a separate SG track laid only as far as the Russian Gauge loop at Rokeliu.
  • Panevėžys - Rubikiai (750mm).

Electrification

25kV 50 Hz

Rule of the road

Most lines are single track, but on double track sections right hand running applies.

Distances

The Current Network Statement gives overall distances for lines in Annex 2.

Other Railways

None.

Tourist Lines

The Panevėžys - Rubikiai 750mm gauge railway.

Metro

None.

Trams/LRT-Systems

None.

Recent and Future Changes

Future Changes

In June 2024 the EU Council of Ministers approved the construction of a standard gauge line to Klaipeda as part of the revised TEN-T network. The proposed route has yet be confirmed but may not follow either existing line to Klaipeda.

Rail Baltica

An EU funding agreement to cover 85% of the costs of building the line from Kaunas to the Latvian border (part of the Rail Baltica II project) was signed on November 18 2016 and a Press announcement in May 2021 advised all necessary land had been acquired, for a total of 392km of new railway in Lithuania.

The Ministry of Transport selected option 6A in May 2022 as its preferred route between the Polish border and Kaunas (Jiesia). This is a 'greenfield' route bypassing Marijampolė, Kazlų Rūda and Kalvarija but allegedly the existing and previously used by passenger services 1435 mm gauge line would continue in use as it is important for military purposes, providing access to the Kazlų Rūda training area.

On 12 June 2025 the Transport Ministry announced it had cancelled plans to seek EU or national funding for the Rail Baltica branch to Vilnius because of the €4bn cost, but then the European Commission announced in August 2025 that Completion of the necessary land acquisitions had been postponed until the end of 2027...

In August 2025, Rail Baltica signed a contract with DB Engineering & Consulting for design and supervision of a double track electrified line of 96km from the border with Poland to Jiesia in Kaunas.

Significant progress is being made in Lithuania, but Estonia are suggesting their part may not be completed until 2035 and not the hoped for 2030, and to save costs the Estonian section initially will not be double track.

Recent Changes (latest developments at top)

Changes in 2025

The service to Riga was so successful that on 6 January the Baltic states railways coordinated their timetables to enable a daily Vilnius-Riga-Tallinn journey (and return) with changes at Riga & Valga. From 10 February the train ran through between Vilnius and Valga.

Changes in 2023

A service from Vilnius via Šiauliai and the cross border line to Jelgava and Riga in Latvia resumed on 27 December.

Changes in 2022

A pair of PKP IC trains were extended across the border daily to Mockava from 11 December, with through ticketing onto a guaranteed DMU connection with a LG Mockava - Kaunas - Vilnius service. This restored a passenger service on the broad gauge rails between Šeštokai and Kazlu Ruda. [Mockava - Šeštokai is interlaced mixed gauge.] The limited Białystok (PL) - Kaunas standard gauge FSSuO service was withdrawn from the same date, resulting in no service on the interlaced standard gauge rails between Mockava and Šeštokai, or the separate and parallel standard gauge track from Šeštokai to Kaunas.

The through Białystok (PL) – Kaunas service resumed after Covid on 1 July, but with a less frequent basis tahn previously.

On 1 July, the (Radviliškis -) Panevėžys - Rokiškis line was closed ‘temporarily’ because of low passenger numbers and a lack of spare parts, caused by the war in Ukraine. Rokiškis no longer appeared as an option in the Journey planner drop down boxes but services have resumed to Panevėžys.

On 2 February the government approved the electrification of the 309 km Kaišiadorys – Klaipėda – Draugystės (the port branch south of Klaipėda station) route. €197m of the €398m cost will come from the EU Cohesion Fund.

Changes in 2021

The Kaunas Intermodal Terminal at Palemonas opened to commercial traffic on 19 July, when a train arrived from Tilburg in the Netherlands. This is reached via dual gauge track laid beyond Kaunas station to Palemonas in October 2020; a separate SG track has been laid only as far as the Russian Gauge loop at Rokeliu on the Kaunas avoiding line.

Older Changes

For details of older changes see Lithuania - Older General Information.

Special notes

None.

See also