Border Crossings: Poland - Slovakia: Difference between revisions

From EGTRE
Jump to navigationJump to search
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
==Łupków PKP - Medzilaborce mesto ŽSR==
==Łupków PKP - Medzilaborce mesto ŽSR==
[D] ŽSSK worked to Łupków when passenger services ceased on 29 August 2010, but when Summer only services recommenced SSuO on 1 July 2017 they were worked by PKP DMU's. In 2020 ŽSSK announced the two pairs would run FSSuO between 26 June - 6 September.
[D] ŽSSK worked to Łupków when passenger services ceased on 29 August 2010, but the current Summer only services that recommenced SSuO on 1 July 2017 are worked by PKP DMU's. In 2024 there are two pairs SSuO between 22 June - 29 September plus one pair on 29/30 June.


==(Muszyna -) Leluchów PKP - Čirč ŽSR (- Plaveč)==
==(Muszyna -) Leluchów PKP - Čirč ŽSSK (- Plaveč)==
[E] PKP works to Plaveč. After serious flood damage washed away a bridge north of Muszyna on 4/5 June 2010 the line was completely closed until 17 January 2011 but only freight traffic resumed.  A summer only SSuO passenger service recommenced on 29 June 2019 until 1 September and a similar winter skiing service ran SSuO from 28 December 2019 to 23 February 2020. The 2021 summer dates are 3 July to 28 August, two return trips between Poprad-Tatry and Muszyna worked by ŽSSK DMU's.
[E] The 2024/25 service remains two pairs winter/summer SSuO between Poprad-Tatry and Muszyna worked by ŽSSK that run between 28 December 2024 and 23 February 2024, and 14 June to 14 September 2025.
 
Serious flood damage washed away a bridge north of Muszyna on 4/5 June 2010 so the line was completely closed until 17 January 2011 but initially only freight traffic resumed.  A summer only SSuO passenger service recommenced on 29 June 2019 until 1 September and then a winter SSuO skiing service was added from 28 December 2019 to 23 February 2020 and Covid suspensions excluded, this pattern has continued. PKP also works freight to Plaveč.


==(Nowy Targ -) Podczerwone PKP - Sucha Hora ŽSR (- Trstená)==
==(Nowy Targ -) Podczerwone PKP - Sucha Hora ŽSR (- Trstená)==

Latest revision as of 19:03, 2 December 2024

Łupków PKP - Medzilaborce mesto ŽSR

[D] ŽSSK worked to Łupków when passenger services ceased on 29 August 2010, but the current Summer only services that recommenced SSuO on 1 July 2017 are worked by PKP DMU's. In 2024 there are two pairs SSuO between 22 June - 29 September plus one pair on 29/30 June.

(Muszyna -) Leluchów PKP - Čirč ŽSSK (- Plaveč)

[E] The 2024/25 service remains two pairs winter/summer SSuO between Poprad-Tatry and Muszyna worked by ŽSSK that run between 28 December 2024 and 23 February 2024, and 14 June to 14 September 2025.

Serious flood damage washed away a bridge north of Muszyna on 4/5 June 2010 so the line was completely closed until 17 January 2011 but initially only freight traffic resumed. A summer only SSuO passenger service recommenced on 29 June 2019 until 1 September and then a winter SSuO skiing service was added from 28 December 2019 to 23 February 2020 and Covid suspensions excluded, this pattern has continued. PKP also works freight to Plaveč.

(Nowy Targ -) Podczerwone PKP - Sucha Hora ŽSR (- Trstená)

Line closed and lifted. A bridge was blown up at the beginning of World War 2, thereby closing the border crossing. Czarny Dunajec - Podczerwone closed to all traffic in 1989 and Trstená - Sucha Hora in 1973.

Zwardoń PKP - Skalité-Serafínov ŽSR (- Čadca)

[E] ŽSSK works services to Zwardoń. Electrification was completed in December 2002. Long distance trains via this route ceased in 2018-19 with a change of train required at Zwardoń.

See also